My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV01707
DRMS
>
Back File Migration
>
Revision
>
REV01707
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:59:16 AM
Creation date
11/21/2007 8:54:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980201
IBM Index Class Name
Revision
Doc Date
12/21/1995
Doc Name
RECLAMATION COST SUMMARY FORM
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SXAFT SEALING <br />Task No.~ Task Description ~ Cost (f) <br />Subtotal (K): <br /> <br />L. <br />DRILL <br />HOLE/MONITORING YELL SEALING ____________ <br />Task <br />_____ No.~ <br />__. I__ Task Description <br />_________~ _______ _______ ~ Cost (f) <br />_______I____________ <br />Subtotal (L): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description <br />Cost (f) <br />5 ~ Demolitionof Buildings and Concrete Structures ~ f2,522 <br />6 ~ Seeding ~ 55,650 <br />Fencing <br />7 ~ Mob/Demob ~ 57,903 <br />Subtotal (M ); f10,075 <br />TOTAL D[RECi RECLANAT)ON COSTS (subtotals A through M): 516,4 )b <br />II. INDIRECT COSTS <br />________________________________________________________________________ <br />________________________________________________________________________ <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item Na.l Item Description ~ Cost (f) <br />___..___I_____~_______________~_______..________________I__~_______ <br />). ~ Public Liability Insurance.... 1.550% of dir. ~ f254 <br />2. ~ Contractor's Performance Bond 0.975% of dir. ~ 5160 <br />3. ~ Contractor's Profit........... 70.00% of dir. ~ 51,642 <br />4. ~ Job Superintendent.. <br />Subtotal (A ): f2, 056 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): (18,472 <br />_______ <br />B. DNG PROJECT ADMINISTRATION EXPENSES <br />Item No.l Item Description ~ Cost (f) <br />________I_____________________________~___________________I_______~___ <br />1. ~ Minerals Program Admin. Fee at 5.00% of cnt r.~ f924 <br />MET INDIRECT COST PERCENTAGE: 78.75% Subtotal (B): 5924 <br /> <br />TOTAL INDIRECT <br />RECLAMATION _____ <br />COSTS (subtotals __ <br />A through B): __________ <br />52,980 <br />70TAL PERFORMANCE BOND AMOUNT (direct plus iMirect costs): f19,396 <br />
The URL can be used to link to this page
Your browser does not support the video tag.