Laserfiche WebLink
<br />54 <br /> <br /> 1 I will briefly talk on reclamation. <br /> 2 Reclamation -- the reclamation concepts for this <br /> 3 project remain unchanged from the approved permit. <br />' 4 The re-vegetation, topsoil replacement comment -- <br /> 5 the topsoil replacement and re-vegetation criteria <br /> <br /> 6 are the same as were approved for the or:iginal <br />' 7 application. <br /> 8 The waste rock disposal area reclamation <br />' 9 is the same as was approved for the original <br /> l0 application. That is grading out the waste rock <br />' 11 o <br />th <br />i <br />t <br />l t <br />l <br />t <br />i <br />t <br />l <br />3 h <br /> n <br />e s <br />opes <br />o approx <br />or <br />zon <br />ma <br />e <br />y <br />a <br />o <br />' 12 1 vertical, replacing 18 inches of topsoil and <br /> 13 re-vegetating with the approved seed mixture. <br />' 14 The tailings facility is unique in that, <br /> 15 because you are spigotting all the way around the <br /> 16 facility, you can do a lot of re-contouring during <br /> 17 your final couple months of disposal, jusr_ by the <br />' <br /> 18 way you spigot out of the tailings area. <br />' 19 And so a lot of the tailings disposal <br /> 20 area contouring will be done through control of <br />' 21 tailings disposal in the last several months of <br /> 22 operation. There will be some final grading that <br />' 23 will b <br />i <br />d <br />b <br />t th <br />t <br />ill b <br />l <br />i <br />i <br />t <br /> e requ <br />re <br />, <br />u <br />a <br />w <br />e a m <br />ma <br />amoun <br />n <br />. <br />' 24 The free water that will be pooled on <br /> 25 top of the tailings disposal area will be <br /> <br /> AGREN, BLANDO & BILLINGS <br />1 <br />