Laserfiche WebLink
~~ <br />1 <br />I 1 <br /> <br /> <br />t <br /> <br />1 <br /> <br /> <br />1 <br />r <br />1 <br />t <br /> <br /> <br />1 <br />1 <br /> <br />55 <br />1 spray-evaporated upon reclamation and then grading <br />2 can commence with that tailings disposal facility. <br />3 The grading will establish a general direction <br />4 toward the north, toward the northwest corner of the <br />5 tailings embankment. <br />6 In addition, channels will be <br />7 established across the tailings embankment, the <br />8 tailings disposal area, to tie in the preexisting <br />9 drainages and route them across the tailings <br />10 disposal area. <br />11 A spillway will be constructed in the <br />12 northeast corner of the embankment, and I don't <br />13 believe any of the drawings I have up there show the <br />14 location of the spillway, but I'll point it out to <br />15 you. The spillway is located approximate.Ly here and <br />16 it comes down and outlets in the area of ~.he <br />17 collection pond. <br />18 The purpose of the reclamation plan is <br />19 to establish a drainage pattern that approximates <br />20 pre-mining condition and also to allow routing of <br />21 flood flows across the tailings impoundment without <br />22 damage to the integrity of the tailings disposal <br />23 area. <br />24 The design criteria for the low flow <br />25 channels for the tailings impoundment was the <br />AGREN, BLANDO & BILLINGS <br />