My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990-11-15_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1990-11-15_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 12:51:06 PM
Creation date
11/21/2007 8:52:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
11/15/1990
Doc Name
REPORTERS TRANSCRIPT OF PUBLIC HEARING VOLUME I APPLICATION OF BATTLE MTN RESOURCES INC IN COSTILLA
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />53 <br />1 <br /> <br /> <br /> <br /> <br /> <br />1 <br /> <br /> <br /> <br /> <br /> <br />1 <br />1 <br /> <br />1 for the operation and they have prepared and filed a <br />2 temporary substitute supply plan and an Augmentation <br />3 plan to adjudicate the use of its water xights. In <br />4 addition, they filed an application to adjudicate <br />5 nontributary groundwater located beneath the land <br />6 that they own. <br />7 Both of those are currently pending in <br />8 the State Engineer's Office and the Division 3 Water <br />9 Court in ALamosa. <br />10 Water monitoring for this project will <br />11 be very similar to what was approved in the original <br />12 application with the exception of reevaluation of <br />13 water monitoring in the area of the tailings <br />14 facility. <br />15 Battle Mountain Gold has placed four <br />16 additional wells in the area of the tailings <br />17 facility. For those four additional wells, as well <br />18 as other wells and surface water monitoring in the <br />19 area of the tailings facility, they will comply with <br />20 the stipulation placed on the approved permit. That <br />21 stipulation required monthly monitoring of ground <br />22 and surface water in the vicinity of the heap leach <br />23 and quarterly reporting to the Mined Land <br />24 Reclamation Division. They will comply with that as <br />25 it relates to the tailings facility. <br />AGREN, BLANDO & BILLINGS <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.