My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-07-14_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1997-07-14_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 7:54:09 AM
Creation date
11/21/2007 8:52:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
7/14/1997
Doc Name
TECHNICAL SPECIFICATIONS BATTLE MOUNTAIN RESOURCES SAN LUIS PROJECT
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BATTLE MOUNTAIN RESOURCES <br />San Luis Prolecl <br />• Drain impounded or ponded water from work areas. <br />• Cleaz and grub required areas <br />• Excavate culvert trench to required subgrade line. <br />• Place bedding material in trench. <br />• Lay pipe beginning at downstream end of conduit line. <br />• Backfill. <br />• Install erosion control measures (riprap). <br />• Revegetate disturbed azeas. <br />• Complete final grading and site cleanup. <br />Tailing Facility Reclamation: <br />• Develop access roads to work areas, as needed. <br />Page I-4 <br />Technical Speaficatians <br />• Develop a site drainage plan and maintenance scheme including storm runoff sediment <br />control measures. <br />• Drain impounded or ponded water from work azeas outside the tailings impoundment. <br />• Cleaz and grub required azeas. <br />• Grade impoundment surface as trafficability allows. <br />• Place topsoil in newly graded areas, revegetate, and construct all surface water control <br />facilities with revetments. <br />• Excavate material for spillway. <br />• Install revetments in discharge channel and at outlet. <br />• Allow for time to reclaim seepage pond. <br />• Construct water passage channel through perimeter embankment. <br />• Decommission temporary drainage ditches, culverts, and spillway. <br />• Grade azeas outside perimeter berms and extend ditches. <br />• Revegetate disturbed azeas. <br />• Complete final grading and site cleanup. <br />The Designer/Owner reserves the right to modify the Contractor's planned schedule at the time of <br />its submission to meet the overall project requirements. Reclamation of the tailings <br />N:~DHALLMAMSANLUIS~SANLUIS.DOC SR{ project No 14772 <br />June 4, 1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.