My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-07-14_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1997-07-14_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 7:54:09 AM
Creation date
11/21/2007 8:52:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
7/14/1997
Doc Name
TECHNICAL SPECIFICATIONS BATTLE MOUNTAIN RESOURCES SAN LUIS PROJECT
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6ATTLE MOUNTAIN RESOURCES Page I-2 <br />San Luis Project Trehnical Specifications <br />• Applicable safety and health regulations; <br />• Transportation and access conditions; <br />• Availability of utilities; <br />• Erosion control measures; <br />• Subsoil conditions; <br />• Location, availability, and condition ofconstruction materials; <br />• Climate and construction conditions at the site; <br />• Dust abatement requirements; and <br />• Water source required for construction. <br />1.2 Mobilization <br />Upon receipt of the notice [o proceed, the Contractor shall famish, mobilize, arcd install such <br />temporary works, materials, equipment and construction facilities as are necessary for the <br />successful completion of the work. The Contractor shall also operate and maintain such <br />temporary works, equipment and construction facilities throughout the period of construction. <br />All temporary works, such as sanitation facilities, shall fully comply with the applicable rules <br />and regulations of the governing authorities. <br />The Contractor shall obtain all necessary permits and permissions to utilize roads for <br />mobilization, demobilization and access to the site. Access to the site is available by using <br />existing public roads and Owner's roads. <br />Access roads required for construction operations or for the convenience of the Contractor shall <br />be approved by the Owner and maintained in a condition acceptable to the ~~wner at the <br />Contractor's expense. Upon completion of construction, such roads shall be reclaimed to <br />approximate original conditions unless otherwise directed by the Owner. <br />1.3 Suspension and Resumption of Operations <br />The Contractor shall suspend grading, excavation and fill placement operations whenever <br />conditions for such operations aze unsatisfactory due to rain, snow, wind, cold temperatures or <br />any other reason deemed detrimental to said work by the Designer. <br />The Contractor shall be responsible for protection of excavations and fills from inclement <br />weather. Where operations have been suspended, the effects of the rain, wind or other adverse <br />N:\DHALLAIAN\SANLUIS\SANLUIS.DOC SRK Project No 14732 <br />June 4, 1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.