My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-07-14_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1997-07-14_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 7:54:09 AM
Creation date
11/21/2007 8:52:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
7/14/1997
Doc Name
TECHNICAL SPECIFICATIONS BATTLE MOUNTAIN RESOURCES SAN LUIS PROJECT
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BATTLE MOUNTAIN RESOURCES Page I-I <br />San Luis Projcct Technical Specifications <br />1.0 GENERAL PROVISIONS <br />1.1 Supplemental Conditions <br />Prior to any actual construction at the site, the Contractor will be required to submit a detailed <br />work plan to the Designer for approval. The plan will clearly describe all equipment lay down <br />areas, haul and access roads, temporary stockpiles, waste disposal, construction schedule <br />sequencing, and construction methodology if not dictated within the Technical Specifications. <br />Unless otherwise specified, full-time inspection of all construction activities defined by the <br />Specifications will be provided by the Owner. The Owner's inspection of all work shall be <br />performed under the supervision and control of the Designer or his designated representative <br />while such work is in progress. Said inspections aze for the convenience, satisfaction and benefit <br />of the Owner in determining that the work is performed in strict accordan~;e with these <br />Specifications. It shall be the Contractor's sole responsibility to provide all required materials <br />(both natural and manufactured) and to perform all work in conformance with the ;specifications. <br />The Owner's inspections and approvals shall not relieve the Contractor of responsibility for the <br />adequacy and acceptability of the finished work or portions thereof. All work performed by the <br />Contractor shall be subject to final approval by the Owner and the Designer, brit the detailed <br />manner and method of doing the work shall be under the control of the Contractor. The Owner <br />reserves the right to perform portions of the work described herein using the Owner's equipment <br />and manpower. <br />Construction quality control testing shall be conducted by the Designer during the course of the <br />construction activities unless otherwise indicated in these Specifications. Quality control testing <br />shall consist of, but is not limited to, determination of moisture-density rel~dionships for <br />compaction control, grain size analyses, agricultural soil analyses, concrete/grout compressive <br />strength, and moisture content and density determinations for fill materials. Unless otherwise <br />indicated, test procedures shall conform to applicable ASTM standards, as documented in the <br />edition of the standards in force at [he start of work. <br />The Contractor shall examine the Specifications and Drawings to be awaze of all conditions at <br />the site affecting execution of the work. These conditions include, but aze not limit<:d to: <br />• Selecting borrow areas; <br />N:\DHALLMAN\SANLUIS\.SANLUIS.DOC SRK Project No I <br />June 4, 1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.