My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-07-14_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1997-07-14_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 7:54:09 AM
Creation date
11/21/2007 8:52:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
7/14/1997
Doc Name
TECHNICAL SPECIFICATIONS BATTLE MOUNTAIN RESOURCES SAN LUIS PROJECT
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BATTLE MOUNTAIN RESOURCES Page 6-5 <br />San Luis Project Technical Spccificanons <br />ROCK PARTICLE <br />SIZE (INCHES) % PASSING <br />BY WEIGHT <br />7.0 100 <br />6.0 100 - 85 <br />5.0 100 - 50 <br />3.5 50 <br />1.0 < 15 <br />6.7 Material Type 6 - Riprap <br />olL <br />The Contractor shall furnish, transport and place Type 6 material as set forth in the <br />Specifications, the Drawings or as directed by the Designer. <br />Type 6 material shall be used as erosion protection for the perimeter berms where the four <br />drainage basins discharge into the impoundment and for the ditches extending out from the <br />impoundment. Type 6 material shall consist of hard durable rock fragments obtained on site or <br />imported. Type 6 riprap shall meet the following gradation requirements: <br />ROCK PARTICLE <br />SIZE (INCHES) % PASSING <br />BY WEIGHT <br />16 100 <br />14 100 - 85 <br />12 100 - 50 <br />8 50 <br />2 <15 <br />6.8 Material Type 7 - Riprap <br />blt <br />The Contractor shall furnish, transport and place Type 7 material as set forth in the <br />Specifications, the Drawings or as directed by the Designer. <br />Type 7 material shall be used in the grouted riprap channel lining for steeper :sections of the <br />tailings impoundment spillway (Sta. 5+90 to End) as described in Section 8.0 of these <br />Specifications. Type 7 material shall consist of hazd durable rock fragments obtained on site or <br />imported. Type 7 riprap shall meet [he following gradation requirements but shoilld not contain <br />particles less than 1-inch in diameter: <br />N:\DHALLMANISANLUIS~SANLUlS DOC 6-5 SKK Projcct No. 14732 <br />
The URL can be used to link to this page
Your browser does not support the video tag.