My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-07-14_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1997-07-14_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 7:54:09 AM
Creation date
11/21/2007 8:52:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
7/14/1997
Doc Name
TECHNICAL SPECIFICATIONS BATTLE MOUNTAIN RESOURCES SAN LUIS PROJECT
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BATTLE MOUNTAIN RESOURCCS Page 6-4 <br />San Luis Project Technical Speclficaiions <br />ROCK PARTICLE <br />SIZE (INCHES) % PASSING <br />BY WEIGHT <br />1.5 100 <br />1.4 100 - 85 <br />1.1 100 - 50 <br />0.8 50 <br />0.2 < 15 <br />6.5 Material Type 4 - Riprap <br />t)l~- <br />The Contractor shall furnish, transport and place Type 4 material as set forth in the <br />Specifications, the Drawings or as directed by the Designer. <br />Type 4 material shall be used in the mild sloped portion (Sta. 0+00 to Sta. 6+00) of the tailings <br />facility spillway. Type 4 material shall consist of hazd, durable rock fragments excavated on site <br />or imported. Type 4 riprap shall meet the following gradation requirements: <br />ROCK PARTICLE <br />SIZE (INCHES) % PASSING <br />BY WEIGHT <br />3.5 100 <br />3.0 100 - 85 <br />2.5 100 - 50 <br />1.7 50 <br />0.5 < 15 <br />6.6 Material Type 5- Riprap <br />oil-. <br />The Contractor shall famish, transport and place Type 5 material as set forth in the <br />Specifications, the Drawings or as directed by the Designer. <br />Type 5 material shall be used as erosion resistant channel lining for the diversior, ditches in the <br />reclaimed tailings. Type 5 material shall consist of hard, durable rock fragment:; excavated on <br />site, or imported. Type 5 riprap shall meet the following gradation requirements: <br />N:\DHALLMAN~SANLUIS\SANLUIS.DOC oa SRK Project No. 14732 <br />
The URL can be used to link to this page
Your browser does not support the video tag.