Laserfiche WebLink
BATTLE MOUNTAIN RESOURCCS Page 6-4 <br />San Luis Project Technical Speclficaiions <br />ROCK PARTICLE <br />SIZE (INCHES) % PASSING <br />BY WEIGHT <br />1.5 100 <br />1.4 100 - 85 <br />1.1 100 - 50 <br />0.8 50 <br />0.2 < 15 <br />6.5 Material Type 4 - Riprap <br />t)l~- <br />The Contractor shall furnish, transport and place Type 4 material as set forth in the <br />Specifications, the Drawings or as directed by the Designer. <br />Type 4 material shall be used in the mild sloped portion (Sta. 0+00 to Sta. 6+00) of the tailings <br />facility spillway. Type 4 material shall consist of hazd, durable rock fragments excavated on site <br />or imported. Type 4 riprap shall meet the following gradation requirements: <br />ROCK PARTICLE <br />SIZE (INCHES) % PASSING <br />BY WEIGHT <br />3.5 100 <br />3.0 100 - 85 <br />2.5 100 - 50 <br />1.7 50 <br />0.5 < 15 <br />6.6 Material Type 5- Riprap <br />oil-. <br />The Contractor shall famish, transport and place Type 5 material as set forth in the <br />Specifications, the Drawings or as directed by the Designer. <br />Type 5 material shall be used as erosion resistant channel lining for the diversior, ditches in the <br />reclaimed tailings. Type 5 material shall consist of hard, durable rock fragment:; excavated on <br />site, or imported. Type 5 riprap shall meet the following gradation requirements: <br />N:\DHALLMAN~SANLUIS\SANLUIS.DOC oa SRK Project No. 14732 <br />