My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-07-14_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1997-07-14_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 7:54:09 AM
Creation date
11/21/2007 8:52:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
7/14/1997
Doc Name
TECHNICAL SPECIFICATIONS BATTLE MOUNTAIN RESOURCES SAN LUIS PROJECT
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BATTLE MOUNTAIN RESOURCES Page 6-3 <br />San Luis Project Ti chnical Spenficaiions <br />PARTICLE SIZE % PASSING <br />BY WEIGHT <br />2-inch 100 <br />No. 4 sieve 30 - 100 <br />No. 50 sieve 10 - 60 <br />No. 200 sieve 5 - 20 <br />6.3 Material Type 2 - Backfll <br />The Contractor shall furnish, transport, and place Type 2 material as set forth in the <br />Specifications, the Drawings or as directed by the Designer. <br />Type 2 material shall be used as compacted and general backfill for the West Pit Culvert or for <br />constructing any fill sections required for the tailings impoundment spillway chamlel. <br />Type 2 material shall consist of inorganic clay, gravely clay, sandy clay, sand, or gravel with a <br />maximum particle size of six inches. The material shall be free of any frozen 11>mps, wood or <br />other organic material. If the material contains rock fragments that, in the ~~pinion of the <br />Inspector or Designer, will be injurious to the structure, the material will not be used for <br />backfilling. The material maybe obtained from borrow pits or excavations on site or imported. <br />6.4 Material Type 3 - Riprap <br />The Contractor shall famish, transport and place Type 3 material as set forth in the <br />Specifications, the Drawings or as directed by the Designer. <br />Type 3 material shall be used in the discharge pool at the tailings impoundment spillway outlet. <br />Type 3 material shall consist of hard, durable rock fragments excavated on site or imported. <br />Type 3 riprap shall meet the following gradation requirements: <br />N:\DHALLMAN\SANLUIS\$ANLUIS.DOC 6-s SRK Prajccl No. 14732 <br />
The URL can be used to link to this page
Your browser does not support the video tag.