Laserfiche WebLink
BATTLE MOUNTAIN RESOURCES <br />San Luis Project <br />5.2 Access Roads <br />Page 5-3 <br />Technical Speci~calcons <br />Contractor's access roads shall be planned in such a manner that excavation of said roads shall <br />coincide, to the extent practicable, with the construction of a permanent road and other <br />excavations associated with the project. Prior to development of access roads, the Contractor <br />shall submit a plan showing their location and size for the Construction Inspector's and <br />Designer's approval. <br />5.3 Roads <br />All Roads on the site not existing prior to the project shall be graded to establislo drainage and <br />prevent channeling. Compacted road surfaces will be loosened or ripped and, where possible, <br />steep cut or fill areas shall be graded to reduced slopes. Topsoil shall be place+d on flat road <br />surfaces and seeded in accordance with Section 10 of these Specifications. Banks and slopes of <br />the road will be hand seeded and mulched, if necessary. Reclaimed roads should ultimately <br />blend with the adjacent topography. <br />5.4 Borrow Areas <br />Borrow azeas shall be established, as necessary, for riprap, bedding materials and berm <br />embanlanent materials. The location, physical dimensions, and depth of stripping shall be <br />identified by the Contractor and approved by the Designer prior to commencement of work <br />requiring such borrow material. Within borrow areas, cut slopes shall be maintained at 2H:IV or <br />less. <br />Since borrow sources may consist of waste materials from previous mining activities a[ the site, <br />mining related debris, rubble or other materials may be encountered. If considered by the <br />Designer to be unsuitable for inclusion in the work, these materials must be renooved from the <br />borrow and must be properly disposed in an approved manner. The Designer should be notified <br />immediately upon discovery of foreign substances encountered within borrow areas. <br />All borrow areas are subject to approval by the Owner. Borrow areas must be reclaimed to a <br />condition equivalent to the area prior to material excavation. <br />N:\DHALLMAMSANLUIS\SANLUIS.DOC 5'7 SRK Project No. 14732 <br />