My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-07-14_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1997-07-14_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 7:54:09 AM
Creation date
11/21/2007 8:52:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
7/14/1997
Doc Name
TECHNICAL SPECIFICATIONS BATTLE MOUNTAIN RESOURCES SAN LUIS PROJECT
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BATTLE MOUNTAIN RESOURCES <br />San Luis Project <br />4.0 SITE PREPARATION <br />Page 4-I <br />Tt chnical Speci ficalions <br />Site preparation activities shall consist of clearing, grubbing, and stripping for the culvert trench, <br />tailings impoundment spillway, and surface water diversions as shown on Cne Drawings. <br />Clearing involves removal of surface vegetation by a method that mulches the vegetation for <br />inclusion in the topsoil stockpile. Grubbing involves removal of brush roots in eecess of 2 inch <br />in diameter in the subsoils. Stripping involves removal of organic soils, or otherwise unsuitable <br />foundation materials, as determined by the Designer. M organized topsoil stripping pattern with <br />grade stakes shall be implemented by the Contractor as approved by the Designer to ensure that <br />topsoil is removed without over excavation. <br />Clearing, grubbing, and stripping limits shall extend 5 ft beyond diversion sfiactures, access <br />roads, trenches and other facilities. Clearing and grubbing shall include areas to be covered in <br />riprap. <br />The vegetative and topsoil materials removed during clearing, grubbing and stripping shall be <br />removed and stored in topsoil stockpile azeas. Topsoil stockpiles within or adjacent to areas of <br />disturbance, or in other areas meeting the approval of the Designer, Constructior. Inspector and <br />Owner. Topsoil stockpiles shall not be placed in areas of concentrated stonn run-off, nor <br />blocking access roads, trails or other of the Owner's facilities nor interfere with the Owner's <br />operations or work of other Contractors. Topsoil stockpiles shall be placed with maximum side <br />slopes of 3H:1 V and surrounded with surface water diversion structures and silt ::ences meeting <br />the approval of the Designer. <br />N:~DHALLMAMSANLUIS~SANLUIS.DOC 4-I SRK Project No. 14732 <br />
The URL can be used to link to this page
Your browser does not support the video tag.