Laserfiche WebLink
BATTLE MOUNTAIN RESOURCES Page J-2 <br />San Luis Project Te:hnical Specifcauons <br />originated from the Contractor's operations from damaging land, vegetation and dwellings, or <br />causing a nuisance to persons. Dust shall be controlled to a degree acceptable to the appropriate <br />state and federal agencies, and to the Designer. <br />3.4 Erosion Control <br />During the performance of the work defined by the Specifications or any operations appurtenant <br />thereto, the Contractor shall provide all labor, equipment, material and means required to control <br />erosion within the work areas and storm runoff sediment generation. The Contractor shall retain <br />sediment at the construction site to the greatest degree possible through the adoption of "best <br />management practices" (BMP's). The BMP's shall be utilized in addition to the erosion control <br />measures defined in the Drawings. The BMP's may consist of, but are not restricted to, the <br />following measures; silt fences, hay bale sediment traps, earth dikes, and diversions. These and <br />other BMP's are described in detail in the EPA guidance document entitled 'Storm Water <br />Management for Construction Activities: Developing Pollution Prevention Plans and Best <br />Management Practices" available from the National Technical Information Service (NTIS). <br />3.5 Limits of Work <br />The Contractor shall confine his equipment, the storage of materials, and the operations of <br />workmen to limits indicated by law, ordinances, permits, or selected by the Designer or Owner, <br />and shall not unreasonably encumber the premises with his materials. Caution shai4 be exercised <br />at all times to avoid blocking access and haul roads or in any other way interfioring with the <br />Owner's activities. The Contractor shall not, at any time, engage or instigate activities that <br />would, in the Owner's or Designer's opinion, present a hazazd to Owner's personnel, or <br />operations, or to the public. <br />The Contractor shall meet with the Owner and Designer to establish the extent of the above <br />azeas, and any other azea which may impact the schedule or method of performin;~ the work, to <br />accommodate the work activities in the required areas. <br />N:\DHALLMAMSANLUIS\SANLUIS.DOC ~-Z SRK Project No. 14712 <br />