Laserfiche WebLink
BATTLE MOUNTAIN RESOURCES Page 2-5 <br />San Luis Project Technical Specifications <br />Section 5.2 -Access Roads <br />1) Access road layout plan <br />Section 5.3 -Borrow Areas <br />1) Selected areas for approval <br />Section 5.5 -Blasting <br />1) Blasting Plan (if proposed) <br />Section 5.6 -Grading Plan <br />I) Tailings impoundment <br />Section 7.0 - Geotextile Filter Fabric <br />1) Product data <br />2) Manufacturers certified sample test data <br />3) Samples if requested. <br />Section 8.0 -Grouted Riprap <br />1) Grout mix design <br />2) Grout sample test data <br />Section 9.2 -Culverts <br />1) Product data <br />Section 10.0-Reclamation and Revegetation <br />1) Seed certification <br />2) Fertilizer analyses <br />3) Bag weights or weigh tickets <br />2.10 Spillway Channel Protection <br />A. Steep portions of the tailings impoundment spillway (Sta. 5+90 to End) which are <br />not located in competent bedrock require special revetments to provide erosion <br />control. Erosion control shall consist of a grouted riprap blanket a:s described in <br />Section 8 of these Specifications. Articulated concrete block mat:; ICBM's), or <br />N:\DBALLMAN\SANLUIS\SANLUIS.DOC 2-5 SRK Project No 14732 <br />