My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-07-14_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1997-07-14_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 7:54:09 AM
Creation date
11/21/2007 8:52:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
7/14/1997
Doc Name
TECHNICAL SPECIFICATIONS BATTLE MOUNTAIN RESOURCES SAN LUIS PROJECT
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BATTLE MOUNTAIN RESOURCES <br />San Luis Project <br />Page 2-0 <br />T~ chmcal Specdications <br />requirements of the contract documents. Appropriate action will then be taken by <br />the Designer. <br />Approval by the Designer of the Contractor's shop Drawings shall not relieve the <br />Contractor of his obligation to meet all requirements of the plans and <br />Specifications and shall not relieve the Contractor of his responsibility for the <br />correctness of the shop Drawings. <br />Four sets of shop Drawings shall be submitted to the Designer for the Owner's use <br />and additional sets as required for the Contractor's use. After checking, the <br />additional set(s) will be returned to the Contractor for his use. <br />A. The Contractor shall provide the Owner with "red-line" "as-built" Drawings by <br />properly recording all dimensions that are necessary for construction but are not <br />indicated on the plans, and all changes to any dimensions on the plans <br />implemented during construction. The Contractor shall provide tl~e Owner with <br />all measurements and all data required. Preparation of the "as-built" Drawings <br />will be the responsibility of the Contractor. <br />B. In addition to the submittals required under items A and B of Se~;tion 2.12, [he <br />Contractor is required to submit the following: <br />Division 2 <br />Section 1.1 -Supplemental Conditions <br />1) Detailed work plan <br />Section 1.4 -Schedule of Work <br />1) Detailed work sequence <br />2) Construction milestones <br />Section 1.6 -Health and Safety <br />1) Safety program <br />Section 5.1 -General Excavation <br />1) Rock excavation plan. <br />2) Temporary waste disposal area <br />N:\DHALLMAN'\SANLUIS~SANLUIS.DOC 1-4 SkK ProjecWo 1x73? <br />
The URL can be used to link to this page
Your browser does not support the video tag.