Laserfiche WebLink
BATTLE A10UNTAIN RESOURCES Page 2-I <br />San Luis Project Technical Specifications <br />2.0 SPECIAL PROVISIONS <br />2.1 Definitions <br />A. Project Engineer: Dave Hallman, P.E. <br />C. Project Designer: Steffen, Robertson & Kirsten (U.S.),Inc. <br />7175 W. Jefferson Avenue, Suite 3000 <br />Lakewood, CO 80235 <br />(303)985-1333 <br />D. Construction Inspector: To be determined. <br />2.2 Temporary Utilities <br />A. Temporary Electric: Electric power for construction lighting and power tools <br />must be provided by the Contractor. Contractors using such services shall pay all <br />costs of temporary services, extensions, etc. <br />B. Temporary Water: Water for construction purposes will be available from the <br />existing facilities. <br />C. Temporary Toilet Facilities: Toilets and associated facilities must be provided by <br />the Contractor. All construction personnel will be allowed access only to those <br />specific on-site facilities designated by the Construction Inspector. <br />2.3 Storage Areas <br />A. The Contractor will be required to designate specific areas for use by the <br />Contractor for storage of equipment and materials. These areas wil be subject to <br />the approval of the Construction Inspector. <br />2.4 Pre-Bid Conference <br />A. A public conference shall be held at the job site for the purpose of ~;larifying any <br />questions or comments pertaining to the plans and Specifications. <br />N:\DHALLMAMSANLUISISANLUIS.DOC 1-I SRK Project No. 14712 <br />