Laserfiche WebLink
RECLAMATION COST SUtAMRY coned <br />K. PORTAL/SHAFT SEALING <br />Task p~ Task Description ~ Cost f51 <br />91 ~ Seal 6 Mine Entries ~ SSS,lfi4 <br />~ Inlcudes portal entries and ventilation opening ~ <br />87 ~ Haul material co back if 11 portals in Lone Pine ~ $9,909 <br />41a ~ Seal Portals associated with Lone Pine Area ~ 515,]35 <br />291 ~ Seal dovncomer pipes on SGFA intake/exhaust ~ 52,447 <br />242 ~ Seal SG FA rntake/exhaust sha ECS ~ $61.529 <br />Subtotal (KI: -'.5::::9'19. <br />L. DRILL HOLE/MONITORING WELL INSTALLAS ION AND/OR SEALING <br />Task <br />92A <br />42B <br />42C <br />42D <br />92E <br />92F <br />42G <br />4zI <br />42J <br />282 <br />115 <br />139 <br />190 <br />150 <br />151 <br />152 <br />157 <br />90 <br />Task Desctipt ion ~ <br />Seal Deep Drill Holes <br />Seal Intermediate Drill Holes ~ <br />Seal Shallow Drill Hole9 ~ <br />Seal piezometer associated with MRp129 <br />Seal and plug Exploration Sice S <br />Seal and plug boteholes for wafer tank ~ <br />Seal soils hoeing hole9 6 piezometers (MRp 1681 ~ <br />Reclaim 1 Soil Boring Ho 1e (MR-1891 <br />Reclaim 5 Shallow Wetland Holes (MR-1841 ~ <br />Reclaim Explorac ion Holes IMR-183) <br />MR-187; Seal 6 Plug DYil lhole9 (EE-Twin) ~ <br />Regrade Drill Pads 6 Access Roads <br />Replace Topsoil ~ <br />Plug three dewatering boreholes (MR 2121 ~ <br />Seal RPE plezometers <br />Seal MR 219 drill holes ~ <br />Seal Shaft No. 3 <br />Seal Areas 1,3,8.9,12,15 <br />Seal areas 4-7,10,11,13 <br />Seal Area 2 <br />Seal area 15 ~ <br />Hole 97-15-3 Helicopter A-waist hole IMR 2221 <br />Cost (51 <br />59,717 <br />$8,354 <br />$3,261 <br />51,905 <br />52,962 <br />52,487 <br />$2,418 <br />557 <br />$103 <br />561,559 <br />51,203 <br />$299 <br />$299 <br />52,790 <br />51,372 <br />$11,151 <br />$3,553 <br />$97,571 <br />569,740 <br />$2,832 <br />54,484 <br />$12,181 <br />Subtotal (LI: 5249,448 <br />sheet 7 of 10 <br />