My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV01346
DRMS
>
Back File Migration
>
Revision
>
REV01346
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:58:57 AM
Creation date
11/21/2007 8:51:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
8/14/1997
Doc Name
WEST ELK MINE C-80-007 MR 220 MATERIALS STORAGE BENCH EXPANSION
From
DMG
To
MIKE BOULAY
Type & Sequence
MR220
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COST SUMMARY cont'd <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT S SPECIAL HANDLING <br />Task p~ <br />______, Task Description ~ <br />____________________________________________________I_ Cost (5) <br />___________ <br />39 ~ Topsoil all disturbed areas ~ 515'1, a47 <br />90 ~ Cover Re EUSe Pile vich Subsoil ~ $33,083 <br />62 ~ Distribute topsoil over pad, pica, and roads ~ $1,140 <br />66 ~ Rep la ee topsoil over drill pad ~ 5230 <br />69 ~ Salvage topsoil from 1.2 mill.gal.va ter tank pad ~ 5315 <br />71 ~ Replace topsoil on 1.2 mill.ga 1. ~a ter tank pad ~ 5210 <br />4BA ~ Respread topsoil~on material storage bench (TRg671 ~ 523,749 <br />7] ~ Replace topsoil on Lone Pine Gulch Fan bench ~ 54,143 <br />205 ~ MR-200; Replace Topsoil on DMEA Pove dine Road ~ $311 <br />301 ~ MR-209; Replace Topsoil on Lone Pine Gulch pipeline 53'18 <br />221 ~ Replace topsoil on shaft site and elec. borehole rd~ $58,900 <br />222 ~ Replace topsoil Erom stockpile pl ~ 541,823 <br />223 ~ Replace topsoil from stockpile pl ~ 518,890 <br />229 ~ Replace topsoil from stockpile p4 ~ 53.7'15 <br />225 ~ Replace topsoil From stockpile p6 ~ $153 <br />200 ~ Replace topsoil on dera[. bh pad and road (MR 212) ~ 5318 <br />101 ~ Dist ribu to topsoil from NSS to RPE ~ 512,671 <br />102 ~ Replace tope oil on RPE ponds ~ $2,826 <br />103 ~ Redistribute topsoil on RPE road ~ 5681 <br />104 ~ Redistribute topsoil from N55 [o LRP ~ $15,02'1 <br />105 ~ Replace topsoil on add'1 mine entrance disturbance ~ 5657 <br />120 ~ Replace topsoil on NSS area ~ ~ 56,752 <br />122 ~ Place topsoil on RPE area ~ $47,004 <br />133 ~ Replace topsoil on MR 214 drill pads, roads ~ 5],333 <br />16fi ~ Replace topsoil on MR 218 disturbance areas ~ $5.737 <br />486 ~ Haul topsoil from TSS q5 to MSB cut slope ~ 54,381 <br />4BC ~ Haul topsoil from TSS p6 to MSB west fill area ~ 51,79fi <br />Subtotal IJ): 5993,288 <br />sheet 6 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.