Laserfiche WebLink
RECLAMATION COST E[R49ARY coned <br />-. EARTHWORK - DRAINAGE CONTROL SYSTEM SNSTA:.LAT ION/REM.OVAL <br />Task q~ iask Description <br />______I_______________________________________________ <br />28A ~ Sediment Pond MB-1 <br />29 ~ Sediment Pond MB-2R <br />)D ~ Sediment 2ond MB-J <br />J1 ~ Sediment Pond MB-9 <br />32 ~ Sediment Pand MB-5 <br />33 ~ Sewage Treatme n[ Pond <br />34 ~ Freshwater Pond FN-1 <br />53a ~ Backf ill MB-1 and FW-1 Emergency Spillways <br />35 ~ Diversion Ditches DCW-lA and 1B and D1-6 <br />36 ~ All Sediment Ditches <br />Install tip rap in permanent diversion ditches: <br />3BA ~ DCW-2 <br />7BD ~ Remove riprap at Bear Mine Ni <br />JeE ~ Remove brush pile at Bear Mine 31 <br />3BF ~ Rill 6 Cully repair during liability period <br />1547.991 (DJB))(200 hours) <br />MR-177 Portal Bench Drainage Design (MR-177) <br />111 ~ Remove RPE ponds <br />119 ~ Regrade RPE sediment control ditches <br />119 ~ Regrade NSS pond <br />Cost IS) <br />$16,525 <br />$14,fi31 <br />51,444 <br />573 <br />5743 <br />$13 <br />59,255 <br />5692 <br />51,376 <br />5135 <br />$17,900 <br />$1,896 <br />51, 87J <br />59,598 <br />52.057 <br />$17,785 <br />5823 <br />534fi <br />Subtotal lIl: 596,665 <br />sheet 9 of 30 <br />