My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV01346
DRMS
>
Back File Migration
>
Revision
>
REV01346
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:58:57 AM
Creation date
11/21/2007 8:51:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
8/14/1997
Doc Name
WEST ELK MINE C-80-007 MR 220 MATERIALS STORAGE BENCH EXPANSION
From
DMG
To
MIKE BOULAY
Type & Sequence
MR220
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. EARTHWORK - FINISH GRADING <br />Task p~ iask Description <br />27 ~ Entire BackEilled area <br />ADDITIONAL ROAD RECLAMATION <br />239 ~ Pull up material for light use road reclamation <br />275 ~ Rip dewat eying horehole road (MR 2121 <br />277 ~ Regrade "" <br />201 ~ Remove roadbase on dewac. bh access rd (MR 2121 <br />107 ~ Rip RPE road <br />lOB ~ Rip mine entrance expansion <br />109 ~ 0.egrade APE road <br />110 ~ Regrade mine entrance expansion area <br />112 ~ Pull up material for RPE road reclamation <br />117 ~ Regrade NSS area entrance <br />116 ~ Compact ROE road backfill <br />132 ~ Regratle MR 219 drill roads <br />154 ~ Regrade MR 21E borehole roads <br />Cost (51 <br />$9,944 <br />512,137 <br />$57 <br />5681 <br />591 <br />$127 <br />5207 <br />54,008 <br />51,119 <br />51,3x2 <br />589 <br />$355 <br />5916 <br />59.73] <br />Subtotal (G): 590,905 <br />N. EARTHWORK - STREAM CRANNEL CONSTRUCTION/RECONSTRUCTION <br />Task p~ Sark Description ~ Cost (51 <br />NA ~ No Stream Channel Reconstruction is Required <br />Subtotal IH1: <br />sheet 4 of 1D <br />
The URL can be used to link to this page
Your browser does not support the video tag.