Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd <br />E. EARTHWORK - RIPPING <br />Task pI <br />-_____I Task De scx ipt ion I <br />_____________________________________________________ Cost (5) <br />___________ <br />I Rip compacted areas as follows: ~ <br />16 ~ New Access Rd from Hvy 173 [o Sylvester Gulch Rd I 5120 <br />1] ~ Sylvester Gulch Fan Pad and Road ~ 5150 <br />1E ~ Stack Tubes and Reclaim System I $1,299 <br />19 ~ All surface Eaci lily areas ~ 52,598 <br />20A ~ Light-VSe and Access Roads (MB-2R 6 DID-31 ~ 5242 <br />21 ~ Bear pl Mine (including road) I $999 <br />NA I Ripping topsoil included in Seedbed Preparation ~ <br />69 I Rip exploration pad and roads ~ 577fi <br />6] ~ Rip drill pad for water tank boreholes I $75 <br />72 ~ Rip 1.2 million gallon water rank boreholes I $100 <br />53 ~ Rip storage bench access Yoad ITR#6]) ~ $BO <br />54 I Rip truck pull-out lane (TR#6]) I 520 <br />55 ~ Rip portal access road (only portion E. of portals 5120 <br />57 I Rip maceria is storage bench (TRp67) ~ 5729 <br />99 I Rip Lone Pine Gu Lch Fan Pad 6 Staging Area I 5602 <br />75 I Rip rd section to be reclaimed in Lone Pine I 5110 <br />233 I Rip all SGFA dtscurbed areas I 55,90E <br />276 ~ <br />_______ Rip MR 212 devacering borehole pad ~ ~ <br />______________________________________________________ 5172 <br />___________ <br /> Subtotal (EI: 513,199 <br />F. EARTHWORK - ROAD RECLAMATION <br />Task #~ <br />______I Task Des cripcion ~ <br />____________________________________________________I Cost (5) <br />____________ <br />~ Reclaim all cut and fill roads as follows I <br />22 ~ Haul/Access Rd from OEEite Bldg [o Portals I 52,763 <br />23 I Stacktube Access Road ~ 51,339 <br />24 I Middle-Mine Facilities Road ~ 51,055 <br />25 I Ramp from Hvy 133 to Loadouc I 5251 <br />26 I Haul/Access Rd from Sly Culch to Office Bldg I 51,95E <br />26A ~ Push gravel from Lower Roads into MB-2R I 51, OOB <br />26B ~ Push Gravel fzom Lower Roads into MB-3 I '5507 <br />45 ~ Substation Road ~ 516 <br />46 I Main Access Road to Subatat ion ~ 51,134 <br />47 I Haul/Access Rd from Hwy 173 to Sly Gulch Rd ~ 54,272 <br />61 I Regrade drill roads ~ 5824 <br />49 I Backf ill portal access road I 53,292 <br />56 I Backf ill storage bench access road (TRp67) I 5967 <br />E2 ~ Backf ill rd section to be reclaimed o Lone Pine I 5177 <br />74 ~ Reconstruct rd thru Lone Pine fan 6 staging area I 5133 <br />209 ~ MR-200; Regrade DMEA Powerline Road ~ Sa 27 <br />227 ~ Haul backfill fot main access Sta. 60-78 ~ 574,305 <br />229 I Regrade SGFA lt. use roads ~ I 541.699 <br />270 ~ Regrade main access rd Sta. 5E-92 I 528, SOB <br />271 I Regrade main road Sca. ]-SE I 599.202 <br />232 I Regrade substac ion access road (PR071 I 511,517 <br />Subtotal (F): 5220,722 <br />sheet 3 of 10 <br />