Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd <br />B. EARTHWORK - HIGHWALL REDUCTION <br />Task pI Task Description <br />NA ~ No Highvall Reduction Required <br />I ADDITIONAL RIPPING WORK <br />145 ~ Rip Shaft p7 and roads <br />I <br />I <br />I <br />I <br />I CosC ($1 <br />I___-________ <br />$329 <br />I <br />I <br />Subtotal (B1: 5729 <br />C. EARTHWORK - WASTE/TAILINGS PILE CAPPING AND/OR COVER PLACEMENT <br />Task p~ Task Description <br />NA ~ Upper Re Euse Pile is not planned for permit term <br />12 I Grade all ungraded refuse material <br />33 I Final shaping of Lover Refuse Pile <br />NA I Waste Pile cover completed in Task 90 <br />NA I Compaction of refuse material included in Task 15 <br />I <br />I <br />I <br />Subtotal (C): <br />D. EARTHWORK - FILL COMPACTION <br />C09C ($) <br />$87,000 <br />$27,518 <br />$E4,61B <br />Task NI <br />______I <br />________ Task Desczipt ion ~ <br />_____________________________________________ Coat (5) <br />___________ <br />15 I Compact graded refuse material ~ 578,1'16 <br />235 I Compact shaft backfill material ~ 56,942 <br />236 I Compact substat Son backfill ~ 51,736 <br />237 I Compact light use road material ~ 53,957 <br />238 I Compact auha Cation road material ~ 5'129 <br />279 ~ [ompacC main accesss road material ~ 510,156 <br />11'1 ~ Compact residual coal On RPE ~ 51,9]5 <br />144 ~ Compact backf filled material ac Shaft pl pad antl road 52,721 <br />82g I <br />~ Compact add'1 tut material at MSB ~ <br />~ 51, R71 <br />Subtotal (D1: 568,227 <br />sheet 2 of 10 <br />