Laserfiche WebLink
RECLAMATION COST SUMMMY con['d <br />M. REVEL ETAT ION AND RESEEDING <br />Task N~ <br />______ Task Description <br />____________________________________________________ ~ Cost (5) <br />I____________ <br />63 ~ Revegecate drill pads and roads (MR 2121 ~ 58.2'12 <br />7fi ~ Mix N1 - Drill Seed most areas of mine site ~ 597,011 <br />77 ~ Mix pl - Broadcast seed small areas ~ 516,335 <br />78 ~ Mix pl - Nydroseed slopes greated Chan 3:1 ~ 593.520 <br />79 ~ Mix N2 - Broadcast seed riparian areas ~ 5286 <br />BO ~ Shrub Mix N1 - in all areas except riparian zone ~ 5190,494 <br />B1 ~ Shrub Mix p2 - Riparian Zone ~ 53,624 <br />103 ~ Reseed Exploration road (MRN99) ~ 51,075 <br />302 ~ Reseed Lone Pine Gulch pipeline corridor (MR209) ~ S1B2 <br />250 ~ Revegeta to SGFA disturbance ~ 5301,964 <br />210 ~ Revegetace RPE, road, mine entrance, and N55 area ~ 5129,647 <br />Subtotal (M): 5752,010 <br />N. STRUCIVRAI. DEMOLITION 6 REMOVAL <br />Task N~ <br />______ <br />_________ Task Description ~ <br />___________________________________________I Cast (5) <br />____________ <br />43 ~ Demolish and remove all structures, equip., b mat. ~ $2,996,910 <br />43a ~ Demolieh~and remove all structures, equip., b mat. ~ 5702,157 <br />200 ~ MR-193; Remove drainage aprons m Silo ~ 51,639 <br />201 ~ MR-192; Remove Structures D Material Storage Bench ~ 569,191 <br />202 ~ MR-196; Bathhouse Expansion Fa cilicy ~ $13,897 <br />203 ~ MR-199; 12,000 Gallon Tank ~ 51,973 <br />206 ~ MR-200; Remove DMEA Poverline ~ 5694 <br />207 ~ MR-203; 63 Jersey Barriers ~ $3,416 <br />Subtotal (N): 53,789,672 <br />O. EQUIPMENT MOBILI7ATION / DEMOBILIZATION <br />Task N~ Task Description ~ Cost 151 <br />44 ~ Haul equipment to and from job site ~ 531,928 <br />BO ~ <br />~ <br />~ <br />~ Haul additional equipment for P0. O7 wrk ~ 51,159 <br />~ <br />~ <br />~ <br />Su bcotal 10): 539, OB7 <br />sheet 6 of 10 <br />