My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV00644
DRMS
>
Back File Migration
>
Revision
>
REV00644
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:58:19 AM
Creation date
11/21/2007 8:47:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
6/25/1994
Doc Name
TR 34 ADEQUACY REVIEW INCLUDING SMALL AREA EXEMPTION DEMONSTRATIONS PERMIT RENEWAL TEXT UPDATE
From
WESTERN FUELS UTAH INC
To
DMG
Type & Sequence
TR34
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PAGE 2 <br />JUNE 27, 1994 <br />BARBARA PAVLIK <br />Comment 23: The obsolete sentence has been removed from Page IV-22. <br />Comment 26: Table V-7 (Page V-34) has been revised to include the titles that have been <br />left off the columns. <br />Comment 34: Table V-2 (Page V-6 and V-7) includes Deserado Mine sediment ponds. It <br />also refers to the pertinent certified drawings. Page V-7 has been revised. <br />Comment 44: This comment has been taken care of by the response to Comment 34. <br />Comment 45: The containment sumps at the east Portal Area will be dewatered via pumping <br />after storm events. <br />Comment 46: The sediment demonstration for the East Portal Area shows that little or no <br />sediment will collect in the sumps, therefore the design, in this respect, should be <br />adequate. <br />Comment 47: The sumps, because they were incised were not originally designed with <br />freeboard. The design of the sumps has been changed to allow for freeboard when at <br />design capacity. This design change has been reflected on the East Portal area map <br />included with the SEDCAD run. <br />Comment 48: The run-off and sediment from the Explosives Storage Area will be handled <br />with a porous rock outlet structure. <br />Comment 49: The upland diversion ditch for the Explosives Storage Area lies between the <br />vertical rock face and the edge of the pad. The ditch has been identified on the drawing <br />includes with the SA.E. demonstration. <br />Comment 50: The flow off of the Halandras Trash Dump Area will be handled through a <br />porous rock outlet structure. <br />Comment 51: The flow off of the Topsoil Pile near RP-1 will be handled through a porous <br />rock outlet structure. <br />
The URL can be used to link to this page
Your browser does not support the video tag.