Laserfiche WebLink
N <br />Phase 2 & 3 <br />N <br />Phase 2 & 3 dewatering: During these phases groundwater will be diverted via pit dewatering <br />and/or the groundwater collection trench to the dewatering silt pond (see location of silt pond on <br />mining map, Exhibit C) and then gravity fed to the west recharge pond. If the capacity of the <br />west recharge pond is being exceeded groundwater will also be diverted to the Boxelder Ditch. <br />Phase 2 & 3 monitoring program: <br />1. Piezometers will be monitored monthly. <br />2. A staff gauge will be installed in west recharge pond and the water level will be recorded <br />monthly along with the piezometer readings. <br />3. A measuring device will be installed on the trench system diverting water into the west <br />recharge pond to measure the quantity of water being diverted into the recharge pond. Flows <br />to be measured monthly. <br />4. The monitoring program during this phase will be specifically aimed at identifying any <br />problems with the recharge capacity of the west recharge pond. The monitoring program is <br />as follows: <br />a) A relationship will be established during the first three months of operation in Phase 2 <br />between 1) the water level in the west recharge pond and the water level in piezometer <br />P6. Example: if during the firs[ three months the water levels in west recharge pond <br />range from 0.5-0.8 feet higher than the water level in piezometer P6, the largest elevation <br />difference during the three months, 0.8 feet, will become the recorded elevation <br />difference (RED) between the west recharge pond and piezometer P6. <br />b) A maximum elevation difference (MED) between [he west recharge pond and piezometer <br />P6 will be calculated as the (RED) plus I.0 feet. If the (MED) is exceeded DMG will be <br />notified. (example: continuing the example from item 4a., if the elevation difference <br />between the west recharge pond and piezometer P6 exceeds 1.8 feet (1.0 +0.8), DMG <br />will be notified). <br />c) After DMG has been notified, Connell Resources will review records from all nine <br />monitoring wells and submit a report to DMG within 30 days. The report will present an <br />analysis of [he groundwater elevation drop and a mitigation plan to restore [he <br />groundwater recharge to conditions present at the beginning of Phase 2. <br />Phase 4 <br />Phase 4 dewatering: During Phase 4 groundwater will be diverted via pit dewatering and/or the <br />groundwater collection trench to the dewatering silt pond and then gravity fed to the west <br />recharge pond. If the capacity of the west recharge pond is being exceeded groundwater will also <br />be diverted to the Boxelder Ditch. Install a head balancing pipe (min. 8 inch dia) between [he <br />two recharge ponds and install an overflow pipe from the east recharge pond to the Boxelder <br />Ditch. Monitor piezometer P7 daily and if the water level drops more than 1 foot during <br />excavation, then start diverting the water to the existing the drain, or the drainage culvert under <br />County Road 36. <br />