Laserfiche WebLink
M N <br />TIMNATH CONNELL PIT <br />Groundwater Dewatering/Monitoring Program: <br />Tuttle Applegate, Inc. Job # 98-273 <br />Date: 1 / 10/00 <br />Five piezometers are located on the Timnath Pit property. Four additional piezometers have been <br />installed on Mr. Louie Swift's property to the south of the Timnath Pit. The attached map shows <br />the location and ground surface elevation of the nine monitoring wells. <br />Connell Resources will coordinate with Terracon on the collection of groundwater depth <br />measurements on the nine wells. Reporting of the data that is collected by Terracon will be <br />submitted to Connell Resources and copied to Mr. Louie Swift and provided to the Division of <br />Minerals and Geology with the annual report. <br />The depth measurements will be completed on a monthly basis beginning in October, 1999 and <br />will continue through the completion of Phase 5 of the mining plan. After Phase 5 is completed <br />the wells will be monitored for groundwater levels on a quarterly basis until Connell Resources <br />completes mining and reclamation of the site. <br />Dewatering/Monitoring Program (by Mining Phase): <br />Phase 1 <br />Phase 1 dewatering: Prior to mining Phase l a temporary dewatering silt pond will be <br />constructed (details provided below). Groundwater pumped from the Phase 1 mining will be <br />diverted to the temporary dewatering silt pond and then to the Boxelder Ditch. Piezometer P6 will <br />be monitored daily and if the water level drops more than 1 foot during excavation, then water <br />will be diverted to the temporary dewatering silt pond and then to the drainage culvert under <br />County Road 36. At the completion of Phase I mining, the west recharge pond will be <br />constructed and will be used for recharge through the rest of mining. <br />Phase 1 monitoring program: Piezometers will be monitored monthly with the exception of <br />piezometer P6. Piezometer P6 will be monitored daily during the initial dewatering of Phase 1 <br />until the dewatering program for Phase 1 has been established. <br />Temporary Silt Pond: The temporary silt pond will be located east of Phase 1 and west of the <br />Boxelder Ditch approximately 20 feet by 30 feet in size. The pond will be constructed at the high <br />point between the ditch and Phase 1 to allow gravity flows to the Boxelder Ditch and to the <br />County Road 36 culvert. If Connell determines [ha[ the temporary silt pond is not sufficiently <br />removing silt from the water prior to discharge, a gravel filter will be installed. The filter, if <br />needed, will be constructed with a C33 sand and graduate to a 3 inch aggregate. The filter will be <br />constructed to a size capable of handling the flow rate from the groundwater pumping from the <br />Phase 1 mining. <br />