REV00550
DRMS
>
Back File Migration
>
Revision
>
REV00550
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:58:13 AM
Creation date
11/21/2007 8:46:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
3/20/1995
Doc Name
TR 94-18 PN C-82-056
From
TWENTYMILE COAL CO
To
MLR
Type & Sequence
TR18
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Response - No further response required. <br />6. The capacity of the coal stockpile to be expanded was included <br />with the operator's responses. However, the task of removing half <br />of the stockpile to the refuse pile was not included in the <br />estimate. Please see task 102. <br />Response - A bond estimate is provided; however, it states the <br />material will be placed in the portal area as opposed to hauling to <br />the refuse pile. This is an acceptable disposal area for this <br />material and it is closer to the stockpiles. <br />7. The removal of the preparation plant was included in the bond <br />estimate for MR#111. The operator included a cost in this TR for <br />disposing of concrete, but not braking it up. this cost has been <br />included in Task 92A. This cost has been included because the <br />operator has not provided appropriate cross-sections to show that <br />the pads will be covered with a suitable amount of fill. Once this <br />demonstration has been provided, these costs may be removed if <br />appropriate. <br />Response - The bond has been modified to accommodate this task. <br />8. The removal of the thickener tank was included in the bond <br />estimate for MR#111. The operator included a cost in this TR for <br />disposing of concrete, but not breaking it up. This cost has been <br />included in Task 92A. This cost has been included because the <br />operator has not provided appropriate cross-sections to show that <br />the pads will be covered with a suitable amount of fill. Once this <br />demonstration has been provided, these costs may be removed if <br />appropriate. <br />Response - The bond has been modified to accommodate this task. <br />9. The clean coal conveyor was removed from the operator's <br />estimate, and I added it back in as the description of the coal <br />handling structures did not change. <br />Response - The clean coal conveyor has been added back into the <br />bond calculation. <br />10. The answer to this question regarding supplemental fill <br />material is not critical at this time, as the backfilling and <br />grading plan is currently being addressed in Permit Revision No. 3. <br />Response - No further response necessary at this time. <br />Additional Adequacy Questions: <br />1. Topography should be included on Map 24, as it was difficult to <br />determine road grades. <br />Response - The format for Map 24 has been worked out with the <br />Division over a period of time and topography was previously <br />