My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV00303
DRMS
>
Back File Migration
>
Revision
>
REV00303
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:58:00 AM
Creation date
11/21/2007 8:44:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
2/27/1990
Doc Name
TR 56 1989 MID TERM REVIEW MT GUNNISON 1 C-80-007
From
MLRD
To
WEST ELK COAL CO
Type & Sequence
TR56
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stipulation No. 9 <br />ANNUAL HYDROLOGY REPORTS ARE TO INCLUDE, PURSUANT TO RULE 2.04.7 (1)(b), A <br />MAP SHOWING THE PIEZOMETRIC SURFACE OF THE COLLUVIAL AQUIFER IN THE AREA <br />OF THE LOWER PERMANEN7 UNDERGROUND DEYELOPMEN7 WASTE PILE, IF ONE <br />DEVELOPS. <br />Revised page 4-71 contains a statement which satisfactorily incorporates this <br />stipulation into the permit application: "A map will be included in the Annual <br />Hydrologic Report showing the piezometric surface of the colluvial aquifer in <br />the area of the lower refuse pile, if one develops". Stipulation No. 9 is <br />therefore "terminated". <br />New Status: Terminated. <br />Stipulation No. 10 <br />THE DIVISION DIRECTS WEST ELK COAL COMPANY TO COMPLETE A THOROUGH <br />RECONNAISSANCE GEOLOGIC MAPPING OF THE PROPOSED UPPER WASTE PILE ACCESS <br />ROADWAY CORRIDOR. THE APPLICANT SHALL PLACE SPECIFIC EMPHASIS UPON THE <br />DETECTION OF SLOPE INSTABILITY EVIDENCE AND DRAINAGE CHARACTERISTICS OF <br />THE PROPOSED ROAD ALIGNMENT. <br />FURTHER, THE DIVISION DIRECTS WEST ELK COAL COMPANY, UTILIZING THE <br />RESULTS OF THE RECONNAISSANCE GEOLOGIC MAPPING, AND EARLIER ADJOINING <br />SURFACE FACILITY ROAD DESIGN STUDIES, IF APPROPRIATE, TO COMPLETE A <br />PRELIMINARY ACCESS ROAD CUT-SLOPE STABILIZATION AND DRAINAGE DESIGN. <br />THE MAPPING AND PRELIMINARY DESIGN SHALL BE APPROVED BY THE DIVISION, IN <br />WRITING, PRIOR TO ANY DISTURBANCE OF THE ACCESS ROAD CORRIDOR. <br />This stipulation has been incorporated into the permit on revised page 32 of <br />Appendix C-1. The stipulation therefore has been terminated as of October 27, <br />1989. <br />New Status: Terminated. <br />Stipulation No. 11 <br />THE DIVISION DIRECTS WEST ELK COAL COMPANY TO CONSTRUCT THE UPPER WASTE <br />PILE ACCESS ROAD AS AN INITIAL PIONEER ROAD WITH MINIMIZED EXCAVATION. <br />UPON EXPOSURE OF THE EXCAVATED CUT-SLOPES OF THAT PIONEER ROADWAY, THE <br />OPERATOR SHALL COMPLETE A FINAL GEOTECHNICAL INVESTIGATION OF 7HE ACCESS <br />ROAD CORRIDOR. THIS GEOTECHNICAL INVESTIGATION SHALL BE COMPLETED BY <br />APPROPRIATELY QUALIFIED PROFESSIONAL GEOLOGICAL OR ENGINEERING <br />PERSONNEL. THE PURPOSE OF THIS FINAL INVESTIGATION SHALL BE TO VERIFY, <br />OR APPROPRIATELY AMEND, THE FINDINGS OF THE RECONNAISSANCE GEOLOGIC <br />MAPPING OF THE ROADWAY CORRIDOR. <br />FURTHER, WEST ELK COAL COMPANY, UTILIZING 7HE FINDINGS OF THE FINAL <br />GEOTECHNICAL INVESTIGATION, SHALL COMPLETE A FINAL ENGINEERED CUT-SLOPE <br />AND DRAINAGE DESIGN FOR THE UPPER WASTE PILE ACCESS ROAD. THIS FINAL <br />DESIGN SHALL BE APPROVED BY THE DIVISION, IN WRITING, AND THE <br />CONSTRUCTION COMPLETED IN ACCORDANCE WITH THAT DESIGN, PRIOR TO THE <br />TRANSPORTATION OF ANY WASTE MATERIAL ALONG THAT ACCESS ROAD. <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.