Laserfiche WebLink
This stipulation has been incorporated into the permit on revised page 32 of <br />Appendix C-1. The stipulation therefore has been terminated as of October 27, <br />1989. <br />New Status: Terminated. <br />Stipulation No. 12 <br />THE DIVISION DIRECTS WECC TO COMPLETE THE INSTALLATION OF THE SUBSIDENCE <br />MONITORING NETWORK PRIOR TO THE INITIATION OF EXTRACTION OF COAL WITHIN <br />THE PANEL DESIGNATED IN APPENDIX A TO THE NOVEMBER, 1984 PERMIT REVISION <br />APPLICATION ENTITLED "APPLICATION TO REVISE THE MINING AND RECLAMATION <br />PLAN FOR THE MT. GUNNISON N0. 1 UNDERGROUND MINE". THIS MONITORING <br />NETWORK IS DESIGNED TO MONITOR THE FIRST PANEL WEST FROM THE SW MAINS <br />INTAKES AND SOUTH OF THE N0. 1 WEST SUBMAINS, DESIGNATED AS <br />"PANEL 1W-1S", LOCATED ADJACENT TO AND PARALLEL TO THE WESTERN BOUNDARY <br />OF SECTION 21, RANGE 90W, TOWNSHIP 135. THIS MONITORING NETWORK SHALL <br />CONSIST OF SUBSTANTIAL MONUMENTS DESIGNED TO RESIST FROST-HEAVE, FIRE, <br />AND THE ACTIONS OF CATTLE AND WILDLIFE. <br />Previously complied with. <br />Stipulation No. 13 <br />THE SUBSIDENCE MONITORING NETWORK SHALL BE SURVEYED UTILIZING <br />CONVENTIONAL GROUND SURVEYING TECHNIQUES, DESIGNED TO ACf{IEVE HORIZONTAL <br />ACCURACIES COMPLYING WITH THE U.S. DEPARTMENT OF COMMERCE'S "SECOND <br />ORDER, CLASS II" SURVEY STANDARDS, AND VERTICAL ACCURACIES NO LESS THAN <br />+ 0.2 FEET. THIS GRID SHALL BE SURVEYED TWICE PRIOR TO THE INITIATION OF <br />~l1BSIDENCE. IN CONJUNCTION WITH THESE SURVEYS WECC SHALL SELECT AND <br />ESTABLISH A MINIMUM OF SIX TRIANGULATION BENCH MARK MONUMENTS OUTSIDE THE <br />AREA OF ANTICIPATED SUBSIDENCE EFFECTS, FOR THE PURPOSE OF CORRELATION <br />WITH AERIAL PHOTOGRAMMETRIC POST-SUBSIDENCE SURVEYS. <br />Previously complied with. <br />Stipulation No. 14 <br />WECC HAS REQUESTED PERMISSION TO COMPLETE A PRE-SUBSIDENCE AERIAL <br />PHOTOGRAMMETRIC SURVEY OF THE SUBSIDENCE MONITORING GRID, FOR THE PURPOSE <br />OF CORRELATION WITH THE FIELD SURVEY RESULTS. IT IS WECC'S INTENTION TO <br />UTILIZE AERIAL PHOTOGRAMMETRIC METHODOLOGY TO MONITOR POST-SUBSIDENCE <br />MOVEMENTS OF THE SUBSIDENCE MONUMENTS. THE RESULTS OF THE PRE-SUBSIDENCE <br />FIELD AND AERIAL PHOTOGRAMMETRIC SURVEYS SHALL BE COMPARED FOR EACH GRID <br />MONUMENT. THE AERIAL SURVEY WILL BE ACCEPTED AS ACCURATE AND WILL BE <br />USED FOR SUBSEQUENT POST-SUBSIDENCE MONITORING, IN THE EVENT THAT THE <br />AERIAL PHOTOGRAMMETRIC AND FIELD SURVEYS CORRELATE WITH AN AVERAGE SURVEY <br />POINT LOCATION DEVIATION OF LESS THAN 0.2 FEET VERTICALLY AND <br />HORIZONTALLY, WITH SURVEY POINT LOCATION DEVIATIONS OF LESS THAN 0.4 FEET <br />VERTICALLY AND HORIZONTALLY FOR LESS THAN 95% OF THE SURVEY POINTS, AND <br />WITH NO SINGLE SURVEY POINT LOCATION DEVIATION VERTICALLY OR HORIZONTALLY <br />IN EXCESS OF 0.8 FEET. <br />Previously forgiven. <br />-5- <br />