Laserfiche WebLink
Stipulation No. 7 <br />THE DIVISION DIRECTS WEST ELK COAL COMPANY, PRIOR TO ANY DISTURBANCE AT <br />THE UPPER WASTE SITE, TO INSTALL SEVERAL ELECTRONIC TILT METER TUBES <br />DOWNSLOPE FROM THE TOE OF THE PROPOSED WASTE STRUCTURE. THESE TILT METER <br />INSTALLATIONS SHALL BE INSTALLED AS SPECIFIED IN WECC'S AUGUS7 15, 1985 <br />SUBMITTAL. ONE INDICATOR SHALL BE INSTALLED WITHIN 160 FEET OF THE TOE <br />OF THE WASTE PILE CURRENTLY HALF WAY BETWEEN MONUMENTS S1 AND S4. THE <br />SECOND SHALL BE LOCATED APPROXIMATELY 100 FEET NORTHEAST OF MONUMENT S2, <br />160 NORTH OF TOES OF THE WASTE PILE, AS INDICATED ON DRAWING N0. MG-R <br />C-001, INCLUDED IN THE PERMIT REVISION APPLICATION. DURING THE <br />INSTALLATION OF THESE TILT METER TUBES, THE OPERATOR SHALL AUGER AND LOG <br />THE SURFICIAL AND BEDROCK STATIGRAPHY ENCOUNTERED. AUGERING SHALL <br />CONTINUE UNTIL THE OPERATOR HAS ESTABLISHED INTACT BEDROCK OCCURRENCE. <br />IF ANY EVIDENCE OF EXISTING LANDSLIDE DEPOSITS IS ENCOUNTERED, THE <br />OPERATOR SHALL DEFINE THE NATURE AND EXTENT OF THE PRE-EXISTING SLOPE <br />INSTABILITY. IF SUCH LANDSLIDE ACTIVITY IS DISCERNED, THE OPERA70R WILL <br />BE REQUIRED TO APPROPRIATELY RECONFIGURE THE PILE DESIGN, PRIOR TO <br />INITIATION OF ANY CONSTRUCTION ACTIVITY. <br />WECC's August 15, 1985 letter addresses the entire stipulation. However, this <br />letter appears at the end of Volume 11 of the permit application and is not <br />referenced in the narrative of Volume 11. Thus, until this letter is <br />referenced in the narrative of Volume 11, the stipulation will remain in a <br />"future" status. <br />Status: Future. <br />Stipulation No. 8 <br />SURFACE WATER AND GROUND WATER MONITORING OF THE LOWER PERMANENT <br />UNDERGROUND DEVELOPMENT WASTE PILE WILL INCLUDE THE CHEMICAL CONSTITUENTS <br />SELENIUM, UNIONIZED AMMONIA, AND NITRATE/NITRITE. DETERMINATION OF <br />NITRITE CONCENTRATION WILL BE MADE ONLY WHEN DEEMED NECESSARY BY THE <br />DIVISION. RESULTS AND INTERPRETATIONS ARE TO BE INCLUDED ON A CONTINUING <br />BASIS IN THE WEST ELK COAL COMPANY QUARTERLY HYDROLOGY REPORTS. ANNUAL <br />HYDROLOGY REPORTS ARE TO INCLUDE A SUMMARY OF SEASONAL CHANGES, IF ANY, <br />FOR ALL CHEMICAL CONSTITUENTS (SURFACE WATER AND GROUND WATER) MONITORED <br />DURING THE YEAR. ANNUAL HYDROLOGY REPORTS ARE TO INCLUDE AN ASSESSMENT <br />OF THE IMPACTS OF THE LOWER WASTE PILE TO THE HYDROLOGIC BALANCE DURING <br />THE PREVIOUS YEAR. <br />Revised pages 4-68, 4-70 and 4-71 state: "An assessment of the impacts of the <br />lower refuse pile to the hydrologic balance during the previous year will be <br />included in the Annual Hydrology Report." This commitment reiterates the only <br />part of the stipulation not addressed through technical revision 54. Thus, <br />the stipulation status will be "terminated". <br />New Status: Terminated. <br />-3- <br />