Laserfiche WebLink
• will be mined to access the ore. Amendment No. 8 anticipates additional storage in the <br />existing overburden storage facility in Squaw Gulch. The Squaw Gulch Overburden <br />Storage Area ("SGOSA") is being increased in elevation and the northern and southern <br />portions, as approved in Amendment No. 7, will be merged and encompass the backfilled <br />Globe Hill and Ironclad Mine areas. The AGOSA footprint will remain essentially as <br />currently permitted; however, the configuration will change slightly. Overburden storage <br />also is expected to occur in several of the surface mine areas as backfill. The overburden <br />storage areas and anticipated backfilling are discussed in detail in Section 5.7. <br />New roads will need to be developed to haul ore, overburden, and soil. The <br />approximate alignments of roads outside the active mine areas and overburden storage <br />areas are shown on Drawing C-4. Within the active mine areas and overburden storage <br />areas, these roads are constantly changing as mining progresses and are not shown. A <br />description of the proposed roads is contained in Section 5.8. <br />• Existing facilities, such as the ADR facility and the Fire Assay Laboratory <br />Building, will not be changed as part of Amendment No. 8. Other buildings, particularly <br />at the Ironclad facilities area, maybe consolidated or moved. The modulaz buildings and <br />security station located adjacent to the northeast comer of the VLF at the former site of <br />the Cazlton Mill will be relocated as a result of the Phase N VLF extension. A modular <br />building will be installed at the existing ADR facility to serve as a relocated security <br />entrance and first aid station. Anew ADR facility, the Phase N ADR, will have a <br />building for employee changing and showers. Modulaz buildings will be installed as <br />needed for extra offices and storage, particularly during construction stages. <br />The fuel storage area and equipment ready line will be relocated as part of <br />Amendment No. 8 activities. These areas will be relocated neaz the Ironclad Facilities <br />area. The explosives storage azea also will be relocated to a secure site in the general <br />vicinity of the Ironclad facilities. The fuel storage, ready line, and explosives storage <br />areas are shown on Drawing C-3. <br />u <br />