My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV00143
DRMS
>
Back File Migration
>
Revision
>
REV00143
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:57:51 AM
Creation date
11/21/2007 8:43:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
3/24/2000
Doc Name
PROJECT DESCRIPTION AMENDMENT 8 CRESSON PROJECT M-80-244
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The mining, leaching, and gold recovery procedures will remain essentially the <br />• same as detailed and approved in Amendment No. 7. The reclamation plans for the <br />various components of Amendment No. 8 will have the same goals and objectives as <br />plans presented in Amendment No. 7. Much of the reclamation work required by this <br />Amendment will be a continuation of the work outlined in Amendment No. 7. <br />Nonetheless, a complete reclamation and closure plan for the areas included in this <br />Amendment is presented in Section 11.0. The revised financial warranty computation is <br />contained in Section 12.0 and includes the entire Cresson Project as amended by this <br />application. Section 12 also updates all costs to current rates. <br />Note that where conflicts in plans or procedures may arise between this <br />application and previous permits, amendments, and technical revisions, this application <br />for Amendment No. 8 supersedes the prior applications and permits issued to CC&V. In <br />addition, this Amendment No. 8 incorporates operational parameters similar to those <br />described in the approved Amendment No. 7. As such, much of the operational <br />• information in this document is already approved as part of the existing operations. <br />Changes in operational parameters are those based on new information or technologies <br />and changes in site-specific conditions. Since Amendment No. 8 is closely tied to the <br />existing operations, CC&V has reiterated already approved information in this document <br />for ease of review. Unless specifically stated, CC&V does not view such discussions as <br />constituting a re-opening of items that are currently approved. <br />1.4 Other Modifications <br />At the present time, CC&V is pursuing several other approvals contemporaneous <br />with Amendment No. 8. The documentation required for approval from Teller County <br />has been prepazed and represents Volume IX. Information addressed in Volume IX that <br />is required by Teller County Land Use Regulations includes: <br />• <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.