Laserfiche WebLink
COLORADO DEPARTMENT OF FIEALTH -Water Quality Control Division <br />Rnrionale -Page 7 Permit No. COR-0400A0 <br />quality of stormwater discharges associated with mining operations. /n addition, the plan shall describe the best <br />management pradiors (BMPsJ which will be used to redone the pollutants in stormwater discharges from the mining <br />operation. Facilities must implement the provisions of thcir SWMP as a condition of/his permit. (See Part LB. of <br />the permit for a more detailed description of SWMP requirements for both adis+e and irwdive mines. J <br />A. SWMP For Actise Minina Ottrations - Comems <br />1. Description of Mining Activities <br />2. Aria Subject ro Ej/lueru Limitations Guidelines <br />3. Site Map <br />4. Description ojPotential Pollutant Sources/Material Invemory <br />5. Stormwater Quality Controls, including: <br />aJ SWMP Administrator <br />bJ Risk Ideru~aation and Assessment <br />c) Preveruive Mainttnantt <br />d) Good Housekeeping <br />tJ Spill PreNCntion and Response Procedures <br />n Best Managemem Practicer <br />- Stormwater diversion <br />- Materials handling and spill prevention <br />- Sediment and erosion prevemion <br />g) Employee Eduduion <br />hJ Testing for Non~tormwater <br />6. Comprehensive Inspection and Remrdketping <br />B. SWMP For lnadive Mininr Ootrations - Contems <br />1. Description of Mining Activities <br />2. Site Map <br />3. Desciption of Potemial Pollutam Saurns/1Naterial Inventory <br />4. Stormwater Quality Controls -Best Management Pradins <br />- Stormwater diversion <br />- Sediment and erasion prevention <br />S. Comprehensive Inspection and Remrdkeeping <br />C. SWMP Develoomem. Coordination and Format <br />Some activities required under the SWMP may already be in place. However, the SWMP will require the permittee <br />to coordinate these adivitiu with any necessary new activities in an orderly manner, so that the rrsuh is the <br />reduction or elimination of pollutants reaching state waters from areas not limited by e,Qluent limitations. <br />It is the permittee's responsibility to notes the Cobrado Division ajMinerals and Geology (CDMGJ(formerly the <br />Colorado Mined Land Reclamation Division) of any dwngrs at their site ruulting from the implementation of the <br />SWMP. This notffrcation allows the CDMG to review the SWMP and inmtporate arty potential revisions into the <br />facility s reclamation permit which might be needed. !t is importam to verify that the sire reclamation permit <br />matches the SWMP. Such information is usually mmained in Esltibit G of I10 reclamation permits. <br />The SWMP may rely upon information developed for other similar pollution rnntrol programs such as the SPCC <br />(Spill Prevemion Control and Countermeasures) plan or the Mined Land Reclamation Plan. Appropriate portions <br />of these other plans may be incorporated in the SWMP by reference, as long to a complete SWMP can be <br />reproduced and srrbmiutd to the requesting agenry within the time frame sperified in the request. Those portions <br />of the referenced docvmerus mast be included in the subminal. 71u SWMP must also be readily available to an <br />on-site inspector. <br />