Laserfiche WebLink
MlchaUe L. Austin <br />November 25, 2005 <br />Page4 <br />0742. The applicant shall maintain daffy records of aN diversions, <br />replacements, and the amount of water used for each particular purpose. The <br />applicant shall provide a report of these records to the division engineer and <br />the water commissioner on a monthly basis on a form approved by them.l'he <br />accounting must be submitted wtttNn five (5) calendar days of the end of the <br />month for which the accounting ~ being made. <br />in addition, the applkatnt shall submtt a report from each entity making <br />replacements; tar this plan, those ~tities are the City of Greeley, <br />Consolidated Mutual Water Comparry and the Saint Vrain Left Hand Water <br />Conservancy District The report shall include an aooounttng of ail <br />wastewater plant water effluent controlled by each entity, showing the total <br />volume of water under its control at the various wastewater treatment plartm, <br />and the amount committed to each ~ the redpierrts of the water. <br />8. Applicant shall follow the accounting arxl recharge protocols as referenced in <br />the attached documer><s for the operation of this SWSP. <br />,.~ 9. AN releases of replscemerd water rturst be suftkient ib cover aU out ~ priority <br />depletions and be made under the diredicn and/or approval of the Water <br />Cammisskmrer(s). The replacement may be aggregated to maximi~ <br />beneficial use. The Water Commissioner(s) and/or Division Engineer sha@ <br />determine the rate and timing of an aggregated release. <br />10. The replacement water. wnkn is the sutyed of this plan cannot be sob or <br />leased to any other entity. As a condition of subsequent renewals of this <br />substitute water supply plan, the replacement water must be appurtenant id <br />this stte unttl a plan for augmentation Is obtained. A Dopy of the approval <br />letter should be recorded with the county dark and recorder. All replacement <br />water must be aoncuRent witty depletions in quantity, timing, and locations. <br />The use of replacement water must be in compliance witty all agreements with <br />the providers of replacement water. <br />11. Dewatering at the pits will produce delayed depletons tD the stream system. <br />As long ~ the ptt is continuousy dewatered, the water retained to the stream <br />system should be adequate to offaet the depletions. However, once <br />dewatering at the site ceases, ttte delayed depletions must be addressed. At <br />least three years prior to completion of mining, a plan must be submitted that <br />specifies how the post pumping dewatering deplettons will be replaced in dine, <br />place and artpunt. <br />12. Approval of this plan is for the purposes as stated herein. This office must <br />first approve arty additional uses for which the water may be used. <br />13. The approval of this substitute water supply plan does not relieve the <br />Applicant and/or Landowner of the requirement to obtain a Water Court decree <br />approving a pemianant plan far augmentation or mitigation to ensure the <br />pemranent replacement ~ all depletons, inducting long-term evaporation <br />losses and lagged depletkxu< after gravel mining operations have ceased. K <br />reclamation of the mine sites wtl{ produce a permanent water surface <br />exposing groundwater to evaporation, an application for a plan for <br />