Laserfiche WebLink
This permit consists of a total of 120 pages and includes <br />all items listed in the Table of Contents. Further, it is based <br />upon representations made by the operator and on other <br />information contained in the administrative record. <br />This area permit and the authorization to construct and <br />operate are issued for the operating life of the well(s), unless <br />terminated (Part III, Section B); no reapplication shall be <br />necessary during this period, unless the permit is terminated for <br />reasonable cause (90 CFR 144.39, 144.40 and 144.91). 'However, <br />the permit shall be reviewed every five (5) years, and the <br />results of the review shall be used to determine if changes in <br />the permit are needed. This permit shall also remain in effect <br />upon delegation of primary enforcement responsibility for Class <br />III wells of the UIC Program to the State of Colorado, unless <br />that State has adequate authority, and chooses, to adopt and <br />enforce this permit as a State permit or reissue a new State <br />permit. - <br />Issued this day of ~ -~ 2~~ <br />This permit shall become effective <br />fE6 ~ 200( <br />I{errigan C. Clough <br />Assistant Regional Administrator <br />Office of Partnerships and <br />Regulatory Assistance <br />* NOTE: The person holding this title is referred to as <br />the "Director" throughout this permit. <br />Page 6 of 120 <br />EPA FINAL Area Permit No. CO3870-00000 <br />