Laserfiche WebLink
P.AR I <br />Pag 7 <br />Per it No. CGG-850000 <br />B. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS <br />2. Stormwacer Manaeemenc Plan (continued) <br />In the areas of coal miring facilities direcc'_y re~ulaced by effluent <br />limitations, it is expected chat, through actions ected ac <br />achieving compliance •.rich these limitations, the p~rmictee ::i'_'_ <br />effectively control most site stormwacer discharges. Uowever, in <br />other areas, this may not be the case. Some of the discharges are <br />outside the coverage of the diversion ditches and sedimentation ponds <br />required under the facility's Colorado Mined Land E~eclamacion Division <br />(CML4D) permit. Examples of such areas are roads and railroad lines <br />used for transportation co and from the site, outs}opes of ponds, <br />inactive loadouts, sites used for storage and ma:r.[enance of material <br />handling equipment and areas granted small area exemptions. <br />The plan shall describe all areas that have not been previously <br />permitted, but meet the definition of a stormwacer discharge in 40 CFR <br />122.26, and shall include a map (or maps) denoting the affected <br />areas. The map(s) shall shoe the location of the discharge(s) or <br />drainage areas and indicate the receiving waters. The map(s) shall <br />label each stormwater outfall with a three digit number beginning with <br />the next number after the last numher assigned co iurface runoff <br />oucfalls. <br />The plan shall describe the controls and/or procedures that <br />specifically address the goal of minimizing or eliminating the <br />pollution frog these scurces. In some cases, this may entail <br />construction of physical facili~ies. In other cas s, it may entail <br />developing new methods of operation or material handling and/or <br />replacement of materials with those that are less polluting. The <br />permittee shall make the appropriate decennination5 and receive the <br />appropriate approvals from the CML4D. <br />Sdhere necessary, the plan shall include a schedulelof activities <br />and/or construction with a reasonable time cable foz imolemencacion of <br />any new operations or construction of new facilities necessary to <br />achieve the required goals. The timetable shall allow for attainment <br />of operational level as expediently as possible, but _n ro case after <br />June 30. 1995, in conformance with Part 402(p)(4)(A) of the Federal <br />Clean Water Act. The Division will ensure that no proposed timetable <br />is e:;cessively lengthy. <br />Specific Require mer.[s: <br />a) A coo~~ of the olan shall be Kept on-site and shall be readily <br />available to all personnel involved with compliance with the plan. <br />b) The plan shall contain a statement of certificcion, signed by top <br />management, supporting compliance with the scared goals. <br />c) Records pertaining to imp fomentation of the pln shall be wept .n <br />a '.o¢ and made availaoie on request co Civisio~. C:1L°.D and CPA <br />r =_p resentacives .see ?art _ ~ ?. <br />