My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO31392
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO31392
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:55:06 PM
Creation date
11/21/2007 1:41:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Hydrology
Doc Date
6/25/1992
Doc Name
FINAL PERMIT COLO WASTEWATER DISCHARGE PERMIT SYSTEM COG-850017
From
CDOH
To
RICHARD G ATKINSON
Permit Index Doc Type
NDPES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I <br />Page 6 <br />Permit No. CCG-850000 <br />B. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS <br />1 <br />Effluent Limitations (continued) <br />d) Burden of Proof Requirement <br />The permittee has the burden of proof when requesting relief from <br />total suspended solids (TSS), total iron and/or settleable solids <br />limitations. Relief shall be granted only when necessary and shall <br />not be granted when the permittee has control over [he discharge. <br />The permittee should endeavor co meet the primary limitations <br />whenever possible. <br />1) For rainfall, co waive TSS and total iron limitations, is is <br />necessary to prove that discharge occurred within 48 hours after <br />measurable precipitation has stopped. In addition, co waive <br />settleable solids limitations, is is necessary to prove that <br />discharge occurred within 48 hours after precipitation greater <br />than the 10-year, 24-hour event has stopped. <br />2) For snowmelt, co waive TSS and co cal iron ].imitations, it is <br />necessary to prove chat discharge occurred within 48 hours after <br />pond inflow has stopped. In addition, to waive settleable <br />solids limitations, it is necessary co prove that discharge <br />occurred within 4b hours after pond inflow volume greater tnan <br />the 10-year, 2=.-hour even[ has stopped. <br />The Division shall determine the adequacy of proof. As part of <br />this determination, the Division shall evaluate whether the <br />permittee could have controlled the discharge in such a manner chat <br />primary limitations could have been met. All manual dewatering <br />must meet TSS and total iron limitations. <br />2. Stormwater Management Plan <br />The permittee shall prepare and submit two copies of a Stormwater <br />Management Plan (SWMP) co the Water Quality Control Division- The <br />plan shall be submitted within sic months from the dace that <br />certification under this oermit was eranced to the facili t•~. An <br />additional copy of the plan shall be submitted co: <br />~~ciorado Department of :Natural P.esources <br />`lined Land Reclamation Division - Coal Mining Section <br />423 Centennial Building <br />1313 Sherman Scree[ <br />Denver. CO 80203 <br />The Division will review and approve each plan. 7Jpon approval, the <br />plan shall be Lncor~oraced into the oermictee's certification Sv <br />reference. :allure to implement the ,:p proved ?fan as described siail <br />Se a ~~ioiacion or the permit. she ?Lan shall remain 'n off=_c, as Long <br />as cne ~3ctli- _.. C2gUtaL2Q SV c CD PS ?ermit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.