Laserfiche WebLink
<br />PART ' I <br />Page 8 <br />Permit No. COG-d~0000 <br />B. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS <br />2. Scormwater Mana¢emenC O1an (continued) <br />d) The plan shall include a list of personnel directly responsible <br />for stormwater management. The plan shall describe the procedures <br />to be followed for personnel co judge compliance with the SWMP. <br />e) The plan shall provide for proper trainine of affected employees <br />in techniques and procedures that will assure achievement of all <br />stated goals. <br />f) The permittee shall amend this plan ac any time if there is a <br />change in operation that will or may result in a decericracion in <br />the quality of pollutants addressed by this plan, or if the plan <br />is shown co be ineffective in achieving the specified goals. A <br />copy of the amended plan shall be submitted to the Division and <br />the CMLRD within 30 days, along with an explanation of the reason <br />for the amendment. If the Division finds the amended plan to be <br />inadequate, or if the procedures established are shown to be <br />ineffective once in place, the permittee shall develop and employ <br />new procedures. <br />g) The permittee shall submit arnuai reports due on the anniversary <br />date of the specific facility certification. Each report shall 'oe <br />signed and certified (sae Part I.C.6.~ and shal'_ include a <br />statement affirming chat a thorough inspection of all affected <br />operations covered under this plan has occurred at least once per <br />yuarcer during the period covered by the report. 7f the <br />inspection detects complete conformance with [he plan, this shall <br />be so stated. If the inspection shows the plan co be <br />inappropriate or ineffective in any area, the annual report shall <br />address how the permittee has corrected or intends co correct this <br />deficiency. All annual reports shall become a part of this permit <br />by reference. <br />h) Whenever a facility or a portion of a facility enters the <br />post-mining phase, it is likely chat the overall configuration of <br />the site will change considerably. As the land is reclaimed, <br />roads, railroad lines and structures will be removed, and <br />significanr. reshaping of the surface will occur. Prior co the <br />time when new vegetation becomes as cablished, the surface areas <br />will be subject to potentially significant erosion. The permittee <br />will need to cake adeeuace measures in order to minimize this <br />erosion. Therefore, at the time of post-mining, the permittee <br />shall amend the plan to include specific procedures to minimice <br />erosion and ocher factors that contribute co the discharge of <br />total suspended solids and ocher pollutants from newly reclaimed <br />. areas. A copy of .he amended plan shall be submitted co the <br />Division and the C:1L'D •.+i th the amendment request co change from <br />active to ?ost-mining =equiremencs. <br />