My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO30551
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO30551
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:49:15 PM
Creation date
11/21/2007 12:33:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Hydrology
Doc Date
12/3/1993
Doc Name
VIC FEDERAL REGULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />§ 146.71 <br />(b) Prior to the Director's granting approval for <br />the operation o(a Class 1 hazardous waste injec- <br />tian well, the owner or operator shall submit and <br />the Director shall review the (ollowing in(onna- <br />tion, which shall be included in the completion re- <br />port: <br />(I) All available logging and testing program <br />data on the well; <br />(?) A demonstration of mechanical intrgnty <br />pursuant to § 136.68; <br />(1) Tht anticipaltd maximum pressure and Flow <br />rare al which the ptrmitlee will operate: <br />(4) Thr results of the injection zone and confin- <br />ing zone testing program as required in <br />¢ 146.70(x)(9): <br />(5) The actual injection procedure: <br />(6) The compatibility of injected waste with <br />Fluids in the injection zone and minerals in both <br />the injection zone and the confining zone and wish <br />Iht nialerials used to constnlct the well: <br />17) The calculated area of review based on data <br />obtained during logging and testing of the will <br />and the (onnation, and where necessary revisions <br />to the information submiutd under § 136.70(x) (?) <br />and (3). <br />(g) The status of conecuve anion on wells <br />idemifitd in § 136.701x)(15). <br />(c) Prior to granting approval for the plugging <br />and abandonment (i.e., closure) of a Class I haz- <br />ardous wash injection well, the Direnor shall re- <br />view the in(omration regwred m §§ 136.71(x)(3) <br />and 146 72(al. <br />(d) Any permit ISSaed for a Class 1 hazardous <br />wash injection well far disposal on the premises <br />where the wash is generated shall contain a cer- <br />uficalion by the owner or opemtor that: <br />(I) Tht gtntrator of the hazardous waste has a <br />program to redact the volume or quantity and tox- <br />icuy of such waste to the degree dnermined by <br />the gtntrator to bt economically pracicable; and <br />Q) Injection of the waste is Ihal practicable <br />method of disposal eunemly available to the gen- <br />erator which minim¢es the present and foram <br />Ihreal to human health and the tnvironnttnl. <br />§ 146.71 Closure. <br />(a) Closure Plan. The owner or operator of a <br />Class I hazardous waste injection well shall pre- <br />pare, minntam, and comply with a plan (or closure <br />of the well that meets the regwrcments of para- <br />graph (d) of this sexton and is acceptable to the <br />Direnor. The obligation to implenent [ht closure <br />plan survives the termination of a permit or the <br />cessation of injection aaivities. The requiremem to <br />maintain and implement an approved plan is di- <br />rectly enforceable regardless of whrther the re- <br />gwrcmrm is a condition o(the pemrit. <br />(U The ownu or operator shall submit the plan <br />as a pan of the pernut application and, upon ap- <br />proval by the Direnor, such plan shall be a condi- <br />tion of any permit issued. <br />(2) The owner or opemtor shall submit any pro- <br />posed significant revision to the method of closure <br />re0ened in the plan (or approval by the Direnor <br />no later than the dine on which notice of closure <br />a required to he submitted to the Director under <br />paragraph (b) of this section. <br />(3) The plan shall assure finanual responsibility <br />as required in § 134 5?(a)(7). <br />(4) The plan shall include the (ollowing m(or- <br />ntalion: <br />(i) The type and number of plugs to be used: <br />Oq The placemem a( each plug including the <br />elevation a(Ihe top and bonom of each plug; <br />(iii) The type and grade and quamity of material <br />to be used in plugging, <br />(iv) The method of placement a( the plugs: <br />(v) Any proposed test or measure to be made: <br />(vi) The amount, size, and location (by depth) <br />of casing and any other materials to be left m the <br />well; <br />(vii) The method and location where casing is <br />to be paned, if applicable: <br />(via) The procedure to be used to meet the rc- <br />quiremenls a(paragraph Id)IS) of this section; <br />Ox) Tht estimated cost of closure: and <br />(z) Any proposed test or measure to be made. <br />(5) The Direnor may modify a closure plan fol- <br />lowing the procedures of § I?4.5 <br />(6) An owner or operator o(a Class 1 hazardous <br />wave injection well who ceases injection tempo- <br />rarily, may keep the well open provided he~ <br />(i) Has received authorization from the Diecmr: <br />and <br />(ii) Has described actions or procedures, smis- <br />(actory to the Director, that the owner or operator <br />will take to ensure that the well will not endanger <br />USDWS during the period of temporary Jisusr. <br />These anions and procedures shall include compli- <br />ance with the technical rcyuirrmems apphwble to <br />arrive injection wells unless waived by the Dtrcc- <br />lar. <br />(7) Thr owner or optrmor o(a well that has <br />ceased operations for more than two years shall <br />notify the Director tU days prior m resumrng optrv <br />anon of the well. <br />(b) Notice of intent ra close. Tht owner or oper- <br />ator shall notify the Director m least 60 days be- <br />fore closure of a well At the discretion of the Di- <br />rector, a shover notice period may be allowed. <br />(d Closure repnrr. Within 60 days after closure <br />or at the lime of the next quarterly report (which- <br />ever ales) the owner or operator shall submit a <br />closure report to the Director. If the quarterly re- <br />port is due less than IS days after completion of <br />closure, then the report shall he submined within <br />60 days aher closure. Tht rcpon shall be certified <br />as accurate by thr owner or operator and by the <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.