My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO30491
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO30491
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:49:12 PM
Creation date
11/21/2007 12:28:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
Hydrology
Doc Date
5/20/1996
Doc Name
COMPREHENSIVE MONITORING PLAN FOR COMMERCIAL-SCALE MINING OF NAHCOLITE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The surface rrlonumenks consist of a survey pin cemented to bedrock within a <br />casing. The completion is intended to eliminate frost heaving. <br />3.0 Cavity onfigu_rati~ <br />Cavity growth, size and geometry will be monitored throughout the operating <br />life of the wells according to the procedures listed below: <br />- Frequent (rnonthly) calculation of cavity volume based on daily <br />measurement of injection/recovery fluid (flow, temperature, and <br />density). <br />- Periodic use of leashing simulation model with volume calculation, <br />to predict cavity development (shape and size). <br />- Periodic cavity surveying below the vertical wells with sonar caliper <br />tool as neca;ssary to confum the model. Active vertical production <br />wells will tie surveyed, at a minimum, during mining and at <br />completion of mining. In addition, WRN will continue to pursue <br />alternative mapping technology. <br />SECTION IV -PRODUCTION WELL MECHANICAL INTEGRITY <br />In compliance with BLM and EPA stipulations, WRN will perform a two <br />33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.