My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE72813
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE72813
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:22:20 PM
Creation date
11/21/2007 12:26:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004067
IBM Index Class Name
Permit File
Doc Date
3/25/2005
Doc Name
1st A.R. - Modifications to Application
From
Banks and Gesso LLC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MMRR Quarry, M-2004-067 <br />Response to Jan. 21 Adequacy Review <br />March 23, 2005 <br />Page 16 <br />The relocated Access Road now outlets into Sediment Pond A. The ditch <br />excavation will be completed as part of the Access road construction. <br />There is one culvert to take the east access road ditch drainage across <br />the road to the ditch leading to the sediment pond. Cost: $5,000 <br />Backfilling ponds, outlet removal and grading and riprap placement to <br />reduce erosion potential. Cost: $58,500 <br />Item and Units Quantit Unit Price Cost <br />Drainage Diversion <br />Channels <br />Excavation CY 2,200 $7.00/CY $15,400 <br />Ri ra CY 100 $5.00/CY $500 <br />48" Culverts LF 150 $70.00/LF 10 500 <br />Total $26,400 <br /> <br />Main Access Road <br />Draina a Controls <br />24" Culvert LF 100 $50/LF 5 000 <br />Total $5,000 <br /> <br />Backfill/remove Sediment <br />Ponds <br />Backfill CY 11,000 $5.00/CY $55,000 <br />Remove Outlets EA 3 $1,000/EA $3,000 <br />Misc. Ri ra CY 100 $5/CY 500 <br />Total $58,500 <br />Finish Grade: Quarry Floor, Processing Area, Waste Rock Area <br />Preparation of the final grade for reclamation is estimated in Exhibit L to <br />cost $200/acre. This cost, as adjusted for 39.95 acres of reclamation in <br />the revised plans, is $7,990. <br />Importation of Topsoil <br />The response to Exhibit E, above, commits to bonding for the import of <br />6,700 CY of topsoil material. The largest portion of the cost associated <br />with this import is the haul, which will be assumed to be from a source in <br />the urban area of the Front Range. In case of forfeiture of the bond, hiring <br />a trucking firm to make a 20 mile-round trip is estimated to cost $11.65 per <br />cubic yard, and topsoil is estimated to cost in range of $8.00 per yard in <br />quantities. At a unit cost of $19.65 per yard, the total cost for 6,700 CY of <br />topsoil import is $131,655. <br />
The URL can be used to link to this page
Your browser does not support the video tag.