My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE72813
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE72813
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:22:20 PM
Creation date
11/21/2007 12:26:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004067
IBM Index Class Name
Permit File
Doc Date
3/25/2005
Doc Name
1st A.R. - Modifications to Application
From
Banks and Gesso LLC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MMRR Quarry, M-2004-067 <br />Response to Jan. 21 Adequacy Review <br />March 23, 2005 <br />Page 15 <br />bring them into conformity with the Reclamation Plan, no costs are <br />referenced for this specific purpose under Exhibit L in this response. <br />Revised Estimate. The itemized reclamation costs requested by the DMG <br />in its adequacy review are as follows: <br />Backfilling and Grading, Shot Rock at Max. Disturbance <br />Since topsoil and overburden are covered in other comments and line <br />items, we believe this comment to be limited to the cost and quantity of <br />shot rock that will need to be moved on-site at the time of maximum <br />disturbance. As discussed below under Rule 6.5, and as referenced in <br />Allen Sorenson's comments, the mining plan for MMRR Quarry will <br />commit the operator to "operating the quarry such that final reclamation <br />benching is maintained from beginning to end of the ten year mine plan." <br />While this does not eliminate the need to move shot rock around the site, <br />this does ensure that large quantities of shot rock will not accumulate and <br />that shot rock is backfilled into cells on the pit floor as a matter of routine. <br />The amount of unusable shot rock that will be in a temporary location on <br />the site at any one time will be de minimus. Cost: $0. <br />Backfilling and Grading of Overburden <br />The original submittal for MMRR Quarry contained a footprint of 32.5 <br />acres subject to replacement of overburden. The revised quarry footprint, <br />specifically factoring in new benches and revised bench depths, as <br />described above, contains 36.8 acres over which overburden will be <br />respread. Adjusting the original "Placement of Crusher Fines" line item in <br />Exhibit L by an appropriate factor, the revised cost for this item is $57,543 <br />for 115,087 CY. <br />Construction and Installation of Drainage Diversion Channels <br />Construction and Installation, Main Access Drainage Controls <br />Backfill, Grading, Removal of Sediment Pond Outlet Structures <br />The extended cost of these items is calculated in the table below. <br />Including excavation of Diversion A from the beginning to the Haul Road <br />(where excavation is completed as part of Haul Road excavation), <br />excavation of the terminus ditch leading to the creek channel, riprap pads <br />at the outlets into the creek channel, and Diversion B Corrugated Steel <br />Pipe culverts and post-mining meandering channel. Diversion B itself will <br />be excavated as part of mining as mining progresses across the <br />processing Area and Quarry floor. Cost: $26,400 <br />
The URL can be used to link to this page
Your browser does not support the video tag.