My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE72054
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE72054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:21:29 PM
Creation date
11/21/2007 12:05:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
6/15/2005
Section_Exhibit Name
Tab 23 Bonding
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Miscellaneous Utilities. Underground utility reclamation, including phone lines, water <br />lines, and powerlines, will be abandoned in place. <br />Sediment Ponds. The two sediment ponds will be totally reclaimed. Locations of the <br />impoundments are shown Exhibit 12-2. Material adjacent to the ponds gill be used to fill <br />the ponds in. <br />Road Reclamation. There are approximately 3,300 ft. of haul roads that will be reclaimed, <br />antl 400 feet of access roads that will be reclaimed. It was assumed that this could be <br />accomplished in three 8-hour shifts by a D10N dozes. *** <br />Railroad. The track and ties will be removed from the site. Costs for this operation <br />were determined using CIRCES. Ballast will. be picked up and loaded by scraper to cut <br />areas that will be covered with adjacent slope material. Cut areas will not require the <br />disposal of ballast material due to the fact that these areas will be filled in anyway. <br />Prior to pushing material into a cut area, the topsoil will be dozed out of the way. Once <br />the area has been graded, the topsoil will be respread with dozers. After the areas have <br />been topsoiled, then revegetation can take place. <br />Finish Grading. A cost has been estimated to finish grade the area with wheeled motor <br />graders. This was based on CDMG estimated time frame of 81.1 hours. <br />Rill and Gu11y Repair. A cost to conduct the rill and gully repair (including sediment <br />ponds) has been included in this estimate. It has been assumed that this task could be <br />handled with a Cat D3C Dozer every two year and would continue for th=_ 10 year liability <br />period. <br />Fleet Determination <br />Once the volumes for the various phases of reclamation were determined, the number of <br />shifts, hours per shift, equipment types, operator/operating efficiencies, support <br />equipment, and overall reclamation time span, all of which ultimately affect mobilization <br />and demobilization, had to be determined. The following discussion provides the <br />considerations utilized in determining the equipment fleet needed. • <br />TR-06 9 Revised OS/OS <br />
The URL can be used to link to this page
Your browser does not support the video tag.