My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE72054
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE72054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:21:29 PM
Creation date
11/21/2007 12:05:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
6/15/2005
Section_Exhibit Name
Tab 23 Bonding
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTER 23 <br />BONDING <br /> <br />Introduction <br />The purpose of this section is to provide a reclamation cost estimate, with supporting <br />documentation, for determination of a reclamation performance bond for lands disturbed at <br />the Hayden Gulch Loadout facility. This document will pzovide information regarding all <br />disturbed lands within the proposed permit boundary. The amount of bond required was <br />developed assuming that the bond would be forfeited and the CDMG would assume the <br />reclamation liability. The bond calculation was developed by CDMG during their adequacy <br />review o£ Permit Renewal 03 (RN-03) in February 2003. <br />The CDMG's calculations, costs, and backup documentation for all disturbed lands and <br />facilities are located in Attachment 23-1, RN-03 Bond Cost Calculations <br />Reclamation Cost Cateoories <br />Experience in reclaiming lands has shown, for the purpose of estimating costs, contract <br />reclamation activities Can be grouped into the following categories: <br />Direct Costs <br />1. Bac kfilling and grading <br />2. Topsoil replacement <br />3. Revegetation <br />9. Facility reclamation <br />Indirect Costs <br />1. Mobilization and demobilization <br />2. Engineering redesign fae <br />3. Contractor profit and overhead <br />4. Reclamation management fee <br />5. Public liability insurance <br />6. Contractors performance bond <br /> <br />TR-06 <br />1 <br />Revised OS/OS <br />
The URL can be used to link to this page
Your browser does not support the video tag.