Laserfiche WebLink
CHAPTER 23 <br />BONDING <br /> <br />Introduction <br />The purpose of this section is to provide a reclamation cost estimate, with supporting <br />documentation, for determination of a reclamation performance bond for lands disturbed at <br />the Hayden Gulch Loadout facility. This document will pzovide information regarding all <br />disturbed lands within the proposed permit boundary. The amount of bond required was <br />developed assuming that the bond would be forfeited and the CDMG would assume the <br />reclamation liability. The bond calculation was developed by CDMG during their adequacy <br />review o£ Permit Renewal 03 (RN-03) in February 2003. <br />The CDMG's calculations, costs, and backup documentation for all disturbed lands and <br />facilities are located in Attachment 23-1, RN-03 Bond Cost Calculations <br />Reclamation Cost Cateoories <br />Experience in reclaiming lands has shown, for the purpose of estimating costs, contract <br />reclamation activities Can be grouped into the following categories: <br />Direct Costs <br />1. Bac kfilling and grading <br />2. Topsoil replacement <br />3. Revegetation <br />9. Facility reclamation <br />Indirect Costs <br />1. Mobilization and demobilization <br />2. Engineering redesign fae <br />3. Contractor profit and overhead <br />4. Reclamation management fee <br />5. Public liability insurance <br />6. Contractors performance bond <br /> <br />TR-06 <br />1 <br />Revised OS/OS <br />