Laserfiche WebLink
I <br /> <br /> <br />TAB 23 <br />TABLE OF CONTENTS <br />Introduction <br />Reclamation Cost Categories <br />Hackfilling and Grading <br />Topsoil Replacement <br />Revegetation <br />Facility Reclamation <br />Structure Demolition <br />Powerliaes <br />Facility Areas <br />Miscellaneous Utilities <br />Sediment Ponds <br />Road Reclamation <br />Railroad <br />Finish Grading <br />Rill and Gully Repair <br />Fleet Determination <br />Production Shifts <br />Equipment Types <br />Reclamation Time Frame <br />Mobilization and Demobilization Costs <br />Indirect Costs <br />Contractor Profit and Overhead <br />Liability Insurance <br />Contractors Performance Bond <br />Engineering Redesign Fee <br />Reclamation Management Fee <br />Reclamation Hood Calculation <br />Bonding Summary <br />1 <br />LIST OF ATTACHMENTS <br />Attachment No. <br />23-1 Bond Coat Worksheets <br />i <br />Revised OS/00 <br />Page <br />1 <br />2 <br />2 <br />3 <br />3 <br />3 <br />3 <br />3 <br />9 <br />4 <br />9 <br />4 <br />9 <br />9 <br />4 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />6 <br />6 <br />6 <br />6 <br />7 <br />9 <br />