My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO30103
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO30103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:48:54 PM
Creation date
11/20/2007 11:57:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Hydrology
Doc Date
12/10/2001
Doc Name
WQCD Site Inspection
From
DEPT OF PUBLIC HEALTH AND ENVIRONMENT
To
LORENCITO COAL CO LLC
Permit Index Doc Type
CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Industrial wastewater Facility <br />Inspection Report <br />SECTION A: NATIONAL DATA SYSTEM CODING <br />Trans Code CDPS/NPDES Date <br />N 5 CO-0045080 10/26/01 <br />Fac Eval BI QA County <br />2 S 36 <br />SECTION B: FACILITY DATA <br />1 <br />2 <br />3 <br />Legally Responsible Party <br />Mailing Address: <br />Business Phone: <br />Emergency Phone: <br />Legal Representative: <br />Operating Company: <br />Mailing Address: <br />Business Phone: <br />Emergency Phone: <br />Local Facility Contact: <br />Insp Type Inspector Fac Type <br />N S 2 <br />Operator Plant Class <br />C <br />Lorencito Coal Company, LLC <br />20500 State Highway 12 <br />Weston CO <br />(719)868-2115 <br />(719)868-2115 <br />Bruce Addington <br />81091 <br />4 <br />Lorencito Coal Company, LLC <br />20500 State Highway 12 <br />Weston CO <br />(719)846-2427 <br />(719)846-2427 <br />Ron Thompson <br />Has any of this information changed since the last inspection? N <br />County in which facility is located: Las Animas <br />5. Plant Products: Coal <br />Present Production Rate: start-up <br />Design Production Rate: 2.5 million tons/year <br />Raw Materials: coal <br />SECTION C: AREAS EVALUATED DURING INSPECTION <br />81091 <br />6. Briefly describe the process steps used in producing the product. <br />Include a process flow diagram and a discussion of chemicals used at <br />the site and their final disposition. State the final disposal of <br />wastewater streams. <br />This is a new coal mine where constrution began approximatley in <br />October, 2001. The facility was originally proposed as seven <br />underground mines and one surface mine covering 17,895 acres. <br />However, it has since been modified to only one surface mine. <br />The coal will be transported to a central loadout facility where <br />railroad cars will transport it to the New Elk facility near <br />Stonewall, CO for preparation and washing. <br />The facility will generate surface runoff. No treatment chemicals <br />are proposed at the site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.