My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE71276
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE71276
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:20:36 PM
Creation date
11/20/2007 11:47:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006072
IBM Index Class Name
Permit File
Doc Date
1/3/2007
Doc Name
FW And PW Request
From
DRMS
To
Jeffrey L. Schumacher
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 01/02!2007 <br />User : ESC <br />State : CoMredo Permit/job# :11200&072 <br />County :Logan Abbreviation :none <br />Site :Schumacher Pit tl3 Filename : M072-001 <br />Agency or organization name :ORMS <br />Permit or otherJob action :New 112 Permit <br />Task description : t3ackiilling and <br />HOURLY EQUIPMENT COST <br />to achieve 3h:1v <br />Basic machine :Cat D8R Series ll - 8SU (200t Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cosUhour : $58.24 NA <br />Operating costRraur : $73.75 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator costlhour : $32.78 NA <br />Total unit cosUhour : $164.77 Total fleet cosUhour : 5184.77 <br />< <br />MATERIAL QUANTITIES .. <br />Initial Swell Loose <br />volume : 14,134 LCY factor : NA volume : 14,134 LCY <br /> <br />Source of estimated volume :Operator Estimate !or slopes <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 100 feet <br />Unadjusted hourty production : 852.6 LCYmr <br />Material consistency description <br />Consolidated stockpile <br />Averege push gradient : 5.00 % (r <br />Average site altitude : 4,470 feet <br />Matedal weight : 2,650 Ibs/LCY <br />Weight descdption <br />Decomaosed rock - 25% Rock, 75% Earth <br />JOB TIME AND COST <br />Fieet size : 1 Dozers) <br />Unit cost : $0.401 /LCY <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.11 <br />Altitude : 1.00 <br />Matedal weight : 0.87 <br />Blade type : 1.00 <br />Net correction : 0.48 <br />Adjusted unit production : 410.90 LCY/hr <br />Adjusted fleet production : 410.90 LCY/hr <br />Total job time : 34.40 Hours <br />Total job cost : 55,888 <br />
The URL can be used to link to this page
Your browser does not support the video tag.