Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimatlna Software <br />Task # <br />Date <br />User: <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 perdey <br />Cost tan <br />Agency or organizatbn name :DRMS <br />002 State :Colorado <br />01/02/2007 County:Logan <br />ESC Site :Schumacher Pit #3 <br />Permit or otherjob action :New 112 Permit <br />Task description :Replace topsoil over 14.2 acres <br />Scraper work team -Scraper Cat 627G <br />-Push dozer : NA <br />Support equipment -Load area ~NA <br />-Dump area :CAT 12H <br />Road maintenance -Motor grader :NA <br />-Water truck . NA <br />~akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename ~ scrape2 NA NA grader NA NA <br />% Utllization-machine 100 NA NA 100 NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cosiRrour $56.90 NA NA $21.30 NA NA <br />OperetingcosUhour: $116.80 NA NA $29.05 NA NA <br />Ripper op. cost/hour • NA NA NA $0.00 NA NA <br />Operetorcosdhour. $24.95 NA NA $24.47 NA NA <br />Unit subtotals : $198.64 NA NA $74.82 NA NA <br />Number of units : 1 0 0 1 0 0 <br />Group subtotals : Work : $198.64 Support : $74.82 Maintenance : $0.00 <br />PenniNjob # : M-2006-072 <br />Abbreviation :none <br />Filename : M072-002 <br />