Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Date : 03Jan-2007 <br />User : ESC <br />Permit or job no. <br />Abbreviation <br />Filename <br />M-2008-072 <br />none <br />M072-000 <br />Site :Schumacher Pit #3 <br />State :Colorado <br />County :Logan <br />Agency or organization name :DRMS <br />Penult or iob action :New 112 Permit <br />TASK LIST (DIRECT COSTSI FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -13ac~lling and grading to achieve 3h:1 v slopes dozer 1 34.4 $5, 668 <br />002 -Replace topsoil over 14.2 acres scraped 1 25.4 $8,960 <br />003 -Revegetate 31.7 acres NA 2 50.0 $9,893 <br />004 -Install /encing NA 1 20.0 $500 <br />005 -Mobilization/Demobilization mobilize 1 5.0 $3,824 <br />• indutlea intlatlon tador adjustment or: <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT <br />NA <br />SUBTOTALS :~ 134.9 <br />TOTAL DIRECT COST • <br />Liability insurance : 2.02 % of direct total = <br />Performance bond : 1.05 % of direct total = <br />Job superintendent : NA' NA NA total = <br />Profd : 10.00 % o/direct total = <br />trd~ <br />~.., <br />• not required (or eqp. operafa serves as super.) TOTAL O 8 P = $3, 509 <br />LEGAL•ENGINEERING-PROJECTMANAGEMENT• CONTRACT AMOUNT(direcl+08 P)= $30,354 <br />Financial warranty processing (IegaUrelated costs) : 0.00 total $ NA total = $0 <br />Engineering work and/or contrecf/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $1,518 <br />CONTINGENCY- NA+ NA total= NA <br />•tondnpencres aaounfed for of task level TOTAL INDIRECT COST= (5,028 <br />TOTAL BOND AMOUNT (direct + Indirect) _ $31,871 <br />