My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE70701
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE70701
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:19:58 PM
Creation date
11/20/2007 11:28:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991003
IBM Index Class Name
Permit File
Section_Exhibit Name
INDEX
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br />u <br />MINE PHASING AND TIMETABLE <br />Mining and reclamation will proceed in sequence across the <br />property as illustrated on Exhibit C-2. The intent is to di- <br />rect the initial mining to the areas that were disturbed <br />pre-law. Following is a table showing the different phases <br />and their respective acreage and estimated mining periods. <br />The times are only estimates based on current market demand <br />and will change. <br />Minin e Ph ase Acreaee Years <br /> <br />Phase 1 11.4 7 <br />Phase 2 10.6 12 <br />Phase 3 6.8 8 <br />Phase 4 7.0 13 <br />Phase 5 8.1 12 <br />Phase 6 9.0 15 <br /> Totals 52.9 67 <br />Mining and <br />the year. <br />• January. <br />secutively <br />will be coi <br />removal of the clay is limited to only three months of <br />Currently those months are November, December and <br />Operations will begin in Phase 1 and proceed con- <br />through Phase 6. Removal of the clay within each phase <br />npleted before proceeding to the next phase. <br />Areas outside of the mining phases are buffers. In the event that <br />areas within these buffers become economical to mine (through <br />technology changes and/or future exploration), a technical revi- <br />sion to mine the neca area will be submitted. <br />METHOD OF EXCAVATION <br />Mining and reclamation will be concurrent. Mining operations will <br />begin at one end of each phase and progress to the other end. <br />Within each phase, mining operations will be limited to an area <br />less than 2 acres per year. Overburden removed from the mining <br />area will be used to backfill, shape and reclaim the previously <br />mined out area. <br />The topsoil (if any) will be removed from the new mining area and <br />used to reclaim a previously mined out and prepared area. Gener- <br />ally there is no topsoil. If any topsoil is encountered while <br />mining Phase 1, it will be used to reclaim both pre-law and <br />post-law disturbances. <br />The overburden will then be removed and used to backfill a mined <br />• out area. The overburden, wherever possible, will be ripped and <br />moved with a bulldozer. In most instances the overburden will <br />need to be drilled and shot prior to being moved with the bull- <br />dozer. An Air Track is planned to be used for drilling, and the <br />explosive is planned to be ANFO with the proper initiation system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.